BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 16, 2025 at 7:00 PM

Updated December 17, 2025

Renovation of a multi-residential development in Mobile, Alabama. Completed plans call for the renovation of a one-story above grade, one-unit multi-residential development.

Critical Repair Program - 7177 13th St. - Roof Replacement. Contractors interested in bidding must have a verified application, including all required documentation and credentials, on file with the Community & Housing Development Office. All contractors must meet with the program inspector in person to receive the application packet and discuss the requirements, rules, and expectations of the program. Bids will not be considered from any contractor that has not completed the application/verification process. Bidders are instructed to accommodate homeowners and be considerate of their time and families; complaints may result in a bid not being awarded. Appointments are encouraged and preferred. All bids must be submitted in person at 205 Government Street, South Tower Fifth Floor, Mobile, AL 36602. Pictures must be provided to include material delivery, through each step, to housing inspector during repair. Pictures must be clear, and referenced to home being worked on. Pictures are to be provided in real time, prior to home being completed. Third party apps such as Company Cam(R) are acceptable. o Areas that are found to be spaced decked shall be covered with Vi" exterior grade sheathing material after removing the existing decking. It is the contractors responsibility to ensure the framing and structure will support the additional load. o Remove existing roofing materials down to bare decking. o Check all rooftrusses/rafters and repair/replace as needed to ensure that new roofstructure is flat and smooth without rises or depressions in roofsystem. o Replace all rotten- broken, un-even- weak, or deteriorated decking framing including supporting roofing system such as rafter tails, facia and etc, o Any exposed repaired or replace wood should be protected from the elements, painted to match existing color, o Replaced/repaired decking shall be level and ready to accept felt and shingles. o Check all rooftrusses for strength and stability before re-shingling house. o Remove all unused elements, vents, etc., that are not operational and close them below roof level. o Re-flash all valleys, vents, roofopenings, and chimneys. o Install new boots around all roofpenetrations. o Haul away debris immediately. o Use a magnetic sweep around the perimeter of house and rake away any other debris. o Cover entire roof decking with self-adhered roofing undcrlayment then install synthetic or 15# asphalt impregnated felt underlavment, o Prepare roof decking to accept a ridge vent. o Starter shingles must be self-adhered. o Re-roof with a 30year dimensional class A fiberglass asphalt shingle. (Owners choice of color) (any area deemed to need roll roofing material will be self adhering modified bitumen) cap sheet and (base sheet if needed) install proper metal drip rail for this style roofing. o Contractor must provide shingle color sample to homeowner prior to material delivery. o Shingles must be 1st quality still in the wrapper. Seconds will not be accepted. o Install drip rail around perimeter of house. Shingles shall have Vi" to 1 'A" overhang. o Install roof over ridge vent with-in 2ft ofend ofridge (end to end).

Award

Multi-Residential

$6,900.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2025

December 8, 2025

Project location map

7177 13th St, Mobile, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.