Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 5, 2025 at 7:00 PM
Updated November 11, 2025
Site work for a water / sewer project in Carmel, Indiana. Completed plans call for site work for a water / sewer project.
Hamilton County RFQ Phase 3 US 31 Corridor Water & Wastewater Infrastructure PROJECT SCOPE: The selected developer will provide all financing services, development services, site work, labor and material to develop, construct, operate and transfer drinking water and wastewater infrastructure extending from the initial Phase 1 and Phase 2 projects along the U.S. 31 corridor. The Phase 3 Project may include but not be limited to drinking water transmission and distribution mains and appurtenances, wastewater collection sewers, lift station(s), force mains and appurtenances. The preliminary Project scope will be as shown and described in RFPQ Attachment 1 prepared by Wessler Engineering, Inc. (the "Engineer"). The final Project scope will be determined through the scoping period with the County, Engineer and the selected Developer, during which the selected Developer will be required to provide financing terms, site analysis, construction analysis, and operational terms as needed to create a final scope and a guaranteed maximum price for transfer of the Project to the County upon completion. The Developer's B-O-T Agreement including guaranteed maximum price shall be approved by the County. As part of the scoping process, the selected Developer may be asked to provide multiple budgets for several different scope options so the County can make an informed decision on moving forward (or not) with all or various portions of the Project. It is anticipated upon completion of the scoping period, the County will hold a public hearing and adopt a resolution or ordinance and move forward with the Project and selected Developer to complete the construction and development of the Project. If (1) the selected Developer is unable to produce satisfactory deliverables, including desirable financing terms and budget, or (2) the developer's Agreement is not approved by the County, or (3) the County determines that the Project is not necessary based on the results of the scoping period, then the County will begin a new scoping period with another Developer or cancel this RFPQ process. In either event, the resulting scoping period deliverables will be solely owned by the County, the County may use the information from the scoping period deliverables for its future use and benefit, and the County will not reimburse the Developer for work completed during the scoping period.
Post-Bid
Water / Sewer
$800,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 10, 2025
December 10, 2025
US-31, Carmel, IN
Related To This Project
Carmel, IN
Bid Date: Dec 09 2025
Carmel, IN
Bid Date: Jan 22 2026
Carmel, IN
Bid Date: Nov 19 2025
Carmel, IN
Bid Date: Nov 06 2025
Carmel, IN
Bid Date: Nov 05 2025
Carmel, IN
Bid Date: Aug 11 2021
Carmel, IN
--
Carmel, IN
Bid Date: Sep 17 2025
Carmel, IN
Bid Date: Sep 03 2025
Carmel, IN
Bid Date: Aug 20 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
