BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 5, 2025

Demolition, site work, paving and new construction of a civil project in Dreher Township, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

The project consists of a superstructure replacement of the existing non-composite adjacent box beam bridge carrying SR 447 over unnamed tributary to Wallenpaupack Creek with approach roadway improvements. The proposed structure will be single span prestressed concrete adjacent box beam bridge with two 11 foot lanes and 4 foot shoulders. Other work includes roadway approach pavement reconstruction, guide rail replacement, E&S control measures, temporary traffic control, signing and pavement marking, partial structure removal, and other miscellaneous construction work. Construction will be completed while traffic is detoured as indicated on the approved drawings included in the bid package forState Route 447, Section 650, in Wayne County, Drehler Township From Approximately Station 3+00.00 at Segment 0010 Offset 0317 to Approximately Station 7+50.00 at Segment 0010 Offset 0767, With a Total Work Area Length of 388.00 Feet (0.073 Miles). Federal Project Status: PENNDOT Oversight Non-NHS Project Cost Range: $1,000,000.00 - $2,499,999.99 State Type of Work: BRIDGE RECONSTRUCTION Prequalification Requirement: Yes Pre-Bid Meeting: None Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - SR 447 Over Branch of Wallenpaupack Creek *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$2,500,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

68

11

7

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
633
Active Projects
297
Bidding Soon
4,592
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

January 19, 2026

Project location map

SR 447, Dreher Township, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.