BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 29, 2025 at 8:00 PM

Updated October 30, 2025

Site work for a water / sewer project in Orinda, California. Conceptual plans call for site work for a water / sewer project.

In 2020, the City established the Camino Pablo Underground Utility District, using Utility Rule 20A provisions and Municipal Code Chapter 13.12 procedures. Aerial electric and communication wiring that is currently supported via timber poles would be converted to an underground system in the public right of way along the west side of Camino Pablo between Camino Sobrante to 500' north of the El Toyonal intersection. PG&E would act as the project lead and Rule 20A funds allocated to Orinda (but controlled by PG&E) would be used to fund the majority of the work. The City would need to pay for converting street lighting where it is currently facilitated by the overhead system (wires and light fixtures supported by the timber poles). The City would be charged by PG&E to be a "joint trench participant" and intends to use Gas Tax funding for this. Some property owners may also be required by PG&E to pay a portion of service conversion costs. In October 2021, the City Council authorized agreements required by PG&E for this Project; however due to PG&E scheduling and backlogs, they will not begin estimating or preliminary planning until 2028, with construction in 2030. The project is included in the City's 2026 - 2030 Capital Improvement Program (CIP). As of October 29, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$1,300,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
8
Bidding Soon
1,613
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.