BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Site work for a civil project in Reno, Nevada. Completed plans call for site work for a water / sewer project.

Truckee Meadows Water Authority (TMWA) is accepting sealed bids for all labor, materials, equipment, and incidentals required for the rehabilitation of two underground booster pump stations. Rehabilitation work to be performed at TMWA's Hoge 2 underground booster pump station on Hoge Rd. includes electrical work and pipe work both inside and outside the vault. In addition to the work at Hoge 2 BPS, an insertion valve is to be installed on a 14" transite main within the Lakeridge neighborhood to assist with future shutdowns at the Lakeridge BPS. Question Deadline 12/08/2025 at 2:00 PM PT This Project is deemed a Horizontal Construction Project. The Engineer's estimate is: $334,800 - $409,200 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contractor shall furnish all work, labor, services, supplies, materials, equipment, tools, traffic control operations, transportation, supervision, appliances, appurtenances and incidentals required for the prompt and efficient completion of the project described as the rehabilitation of two underground booster pump stations. Rehabilitation work to be performed at TMWAs Hoge 2 underground booster pump station on Hoge Rd. includes electrical work and pipe work both inside and outside the vault. In addition to the work at Hoge 2 BPS, an insertion valve isto be installed on a 14" transite main within the Lakeridge neighborhood to assist with future shutdowns at the Lakeridge BPS. (Project) as described in the Contract Documents and in accordance with the contract provisions, Plans, and Specifications, together with all work incidental or reasonably inferable which is necessary to produce the results intended by the Contract Documents (collectively, the Work). Contractor shall be responsible for the supervision and coordination of the Work, including the construction means, methods, techniques, sequences and procedures utilized, unless the Contract Documents specifically provide otherwise. The Contractor represents and warrants that it has fully investigated the nature, locality and site of the Work and the conditions and difficulties under which it is to be performed, and that it enters into this Agreement on the basis of its own examination, investigation, and evaluation of all such matters and is in no way relying upon any opinions or representations of the Owner, or any of their respective officers, agents, servants, or employees with respect thereto.

GC Bidding

Water / Sewer

$409,200.00

Public - County

Site Work

19

18

21

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
49
Bidding Soon
455
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

January 12, 2026

Project location map

Hoge Rd & Mason Rd, Reno, NV


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.