Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 31, 2025 at 8:00 PM
Updated November 1, 2025
Demolition, site work, paving, new construction, renovation and addition to a mixed-use development in Cleburne, Texas. Conceptual plans call for the addition of a educational facility; for the demolition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; for site work for a educational facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Proposition A ($175,000,000) addresses replacement construction for two schools, Cooke Elementary and Gerard Elementary, and a ten classroom addition and upgrades to Marti Elementary. Current construction codes require storm shelters be included on any addition or new campus construction. This proposition sets the stage for a phase 2 which would include Coleman Elementary. Coleman is the same age as Cooke Elementary, but its location in a floodplain and limited land, prevent rebuilding while students remain on-site. Cooke, however, has enough land to build a new school while students continue in the existing building. Once the new Cooke is complete, Coleman students could temporarily move into the old Cooke or Gerard, allowing Coleman to be torn down and rebuilt in a future bond. Building a new campus takes about two years from start to finish. Proposition A also includes enhancements of the current Career and Technical Education (CTE) programs as well as an agricultural project center. CTE changes would consist of upgrades to Health/Science Technology, Engineering, Diesel Mechanic, AV Tech, and Culinary programs. Improvements to the agriculture center encompass renovations to the existing barn, the addition of new animal barns, as well as a small animal building, and new concrete parking. Also contained in Proposition A is funding for facility improvements and life-cycle replacements. If paid for by bond funds, these improvements would make school buildings more energy efficient and lower operating costs – allowing the district to allocate its annual maintenance and operations funds back into the classroom for other items like teacher salaries and student programs. This project is part of the school district’s bond. As of October 31, 2025, the bond election will be held on November 4, 2025, with early voting October 20-31, 2025. Information regarding design firm, construction manager, and general contractor selection has not been released. Further details regarding design and construction timelines have not been released.
Conceptual
Educational
$175,000,000.00
Public - City
Addition, Demolition, New Construction, Paving, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
Multiple Locations, Cleburne, TX
Related To This Project
Cleburne, TX
--
Cleburne, TX
--
Cleburne, TX
--
Cleburne, TX
--
Cleburne, TX
--
Cleburne, TX
Bid Date: Feb 11 2026
Cleburne, TX
Bid Date: Nov 20 2025
Cleburne, TX
Bid Date: Nov 20 2025
Cleburne, TX
--
Cleburne, TX
Bid Date: Dec 03 2025
Cleburne, TX
Bid Date: Oct 21 2025
Cleburne, TX
Bid Date: Oct 21 2025
Cleburne, TX
Bid Date: Oct 21 2025
Cleburne, TX
Bid Date: Sep 26 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
