Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 2, 2025 at 7:00 PM
Updated December 3, 2025
Remodeling of a water / sewer project in Des Moines, Iowa. Completed plans call for the remodel of a water / sewer project.
This Project will remodel a portion of the second floor of the current Distribution building for Des Moines Water Works. This remodel will include office space, conference space, training space, storage space and exercise room. The Proposal shall be made out on a preprinted form furnished by the Board and must be accompanied in a separate envelope by a Bid Bond or other security ("bid security") permitted by statute. The amount of the bid security shall be ten percent (10%) of the bid submitted by the bidder. The bid security shall be made payable to the Board. The bid security must not contain any conditions either in the body or as an endorsement thereon. The bid security shall be forfeited to the Board as liquidated damages in the event the successful bidder fails or refuses to enter into a Contract within ten (10) days after the award of Contract and post bond satisfactory to the Board. The Contractor's Bond shall be in an amount equal to one hundred percent (100%) of the Contract price, be issued by a responsible surety approved by the Board, guarantee the faithful performance of the Contract and the terms and conditions therein contained, protect and save harmless the Board from claims and damages of any kind caused by the operation of the Contractor, guarantee materials and workmanship to be free of defects for a period of two (2) years from and after completion and acceptance by the Board, guarantee surface restoration work in public right-of-way to be free of defects for a period of four (4) years from and after completion and acceptance by the Board, and shall otherwise in all respects comply with the Code of Iowa. Question Deadline 11/20/2025 Contractor questions and supplier substitution requests must be submitted The Board reserves the right to reject any or all bids and to waive informalities in any bid. The Board also reserves the right to accept the bid that it determines to be in the best interest of the Board in accordance with Chapter 26 and Subchapters II and III of Chapter 73A, Code of Iowa.
Post-Bid
Water / Sewer
$1,023,000.00
Public - City
Remodeling
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 2, 2025
February 2, 2026
408 Fleur Dr, Des Moines, IA
Related To This Project
Des Moines, IA
Bid Date: Nov 20 2025
Des Moines, IA
Bid Date: Nov 20 2025
Des Moines, IA
Bid Date: Nov 20 2025
Des Moines, IA
Bid Date: Nov 25 2025
Des Moines, IA
Bid Date: Dec 16 2025
Des Moines, IA
Bid Date: Nov 11 2025
Des Moines, IA
Bid Date: Dec 09 2025
Des Moines, IA
Bid Date: Dec 05 2025
Des Moines, IA
Bid Date: Oct 30 2025
Des Moines, IA
Bid Date: Nov 20 2025
Des Moines, IA
Bid Date: Nov 18 2025
Des Moines, IA
--
Des Moines, IA
--
Des Moines, IA
--
Des Moines, IA
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
