BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 21, 2026

Demolition, site work, paving, renovation and addition to a mixed-use development in Coldspring, Texas. Conceptual plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Additions/Renovations to the Coldspring Intermediate Campus Transform the current Intermediate School into the new James Street Elementary School Renovations/Upgrades to the Lincoln Junior High campus District-wide improvements Coldspring Intermediate Campus Renovations/new construction to convert Jones Education Complex to Coldspring Intermediate 3rd - 6th Grade Classrooms Additions and Renovations P.E. Gym and Seating Area (less than 1,000) Library, Reception and Administration Area Separate Bus/Parent Drives and Parking Canopy Upgrades Cafeteria and Kitchen Reno./Expansion Existing Administration Area Renovation Exterior Upgrades (East Wing) Lincoln Junior High Campus Interior classroom restoration Enhanced lighting and fencing for safety New Entrance Improvements Porte Cochere Aluminum awning over existing sidewalk Front entry renovation and door replacement Restroom renovations New theatrical curtains Updated gymnasium flooring, lighting, and bleachers James Street Elementary Campus Existing Intermediate to serve Pre-K - 2nd Grade Students (Existing James Street Elementary will no longer be used by students.) Interior classroom restoration Restroom renovations Pre-K Classroom Additions New Entry and Sidewalk Canopy Playground Equipment Improvements Co-Curricular Facility Improvements New Theatrical Curtains at all campuses New sports flooring, lighting, and telescoping bleachers at LJH Gym; repaint and update locker rooms Replace flooring in COHS gyms, lobby, locker rooms, and dressing rooms Enclose louver openings and upgrade lighting in COHS main & auxiliary gyms Replace bleachers in COHS gyms, baseball field, and softball field Construct two new tennis courts at COHS Add sidewalks, plus storage and dressing facilities for baseball & softball programs District-Wide Improvements Enhanced Lighting and fencing for safety Interior Door and Finish Upgrades Restroom Renovations New Classroom furniture Six New School Buses This project was included in the school district’s bond proposal that did not pass. As of April 30, 2026, information regarding design firm, construction manager, and general contractor selection has not been released. Further details regarding design and construction timelines have not been released.

Conceptual

Educational

$45,000,000.00

Public - City

Addition, Demolition, Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
449
Active Projects
224
Bidding Soon
3,792
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

Project location map

Multiple Locations, Coldspring, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.