BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 11, 2025 at 7:00 PM

Updated December 12, 2025

Renovation of a playground / park / athletic field in Thomson, Georgia. Completed plans call for the renovation of a 3,200-square-foot, two-story above grade playground / park / athletic field.

Target Notice of Award November 31, 2024 Question Deadline 11/14/2025 Any information that the respondent would like to remain confidental should be e-mailed underseparate cover to lcheely@cranstonengineering.com. The e-mail subject must be PROTECTED CM@R Qualifications Statement - McDuffie The Project includes the following Work: McDuffie County, Georgia is considering renovation to an existing baseball scoring tower and restroom building and replacement of a small football scoring tower. Project includes work on two distinct project sites within Sweetwater Regional Athletic Complex. The existing structure is an approximately 3200 square foot, two-story, wood construction structure with a metal roof over wood purlins. The exterior cladding is brick on the first floor and vinyl siding on the second floor. Hurricane Helene did significant damage to the roof, exposing interior to water damage. Vandalism caused additional significant damage to the interior of the building. Proposed scope of work includes constructing a new asphalt shingle roof assembly, including possible replacement of multiple trusses. All existing siding, soffit, and fascia will be replaced with Hardie board. All windows and doors are to be replaced with vinyl and hollow core metal respectively. New interior finishes are proposed to be installed including bathroom tile and drywall repair or replacement on ceilings and walls. New plumbing fixtures and electrical fixtures shall be installed. All building utility services are assumed to be operational. A possible conversion of two existing two-fixture restrooms to multiple single stall ADA restrooms is also being considered. Replace an existing 450 square foot scoring tower with a similar two-story climate-controlled building. Record drawings are not available for either building. A site visit can be arranged upon request. Owner anticipates that the Project's total bid price will be approximately $400,000.00-$500,000.00. The Project has an expected duration of 90 days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
62
Bidding Soon
765
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2025

December 22, 2025

Project location map

To Be Determined, Thomson, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.