BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 7, 2025 at 7:00 PM

Updated November 13, 2025

Site work for a mixed-use development in Huntley, Illinois. Completed plans call for site work for a golf course; and water / sewer project.

Irrigation Pump Refurbishment At Pinecrest Golf Course The Park District has determined that the Illinois Prevailing Wage Act applies to this work and therefore Contractor shall comply with the Illinois Prevailing Wage Act and shall pay, and require every Subcontractor to pay, the prevailing rates of wages as established by the Illinois Department of Labor for each craft or type of work needed to execute the contract in accordance with 820 ILCS 130/.01 et seq. The Huntley Park District reserves the right to determine, in its sole discretion, whether the proposal, in its judgment, meets the needs or purposes intended. The Park District further reserves the right to reject any or all bids and to waive any formality, technicality, or irregularity in any proposal. Wesley Peete, Director of Parks and Facilities 1. Pump Removal: Separate 50 hp. motor from pump, use a 30 ft. spider crane, excavator, or similar with proper rigging for removal of the Vertical Turbine Pump through one Sky Window. 2. Pump Teardown: Disassemble the pump for thorough inspection; to include shafting, couplings, bushings/bearings, impellers, strainer basket, column piping, etc. 3. Cleaning and Sandblasting: Clean all pump components and prepare them for inspection. 4. Inspection: Check the dimensional integrity of all significant parts, assess the straightness of the shaft, and evaluate the clearance for the column and bowl bearings. 5. Repair Report: A comprehensive repair report will be created, documenting the disassembly process, parts replacement, modifications made, and the reassembly of the pump. 6. Repairs: Repair or replace the line shaft and pump bowl bearings as necessary. 7. Packing Replacement: Install new packing, and field adjust. 8. Pump Installation: Lift and lower the pump into place through skylight with a 30 ft. spider crane, excavator. Install new flange gaskets and bolts. Grease motor/bearings. 9. Provide Initial Startup: Check proper wiring, verify motor rotation, pump (run) amperage, pump-down time, etc.

Post-Bid

Water / Sewer

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
539
Active Projects
306
Bidding Soon
3,835
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

November 28, 2025

Project location map

11220 Algonquin Rd, Huntley, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.