BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2025 at 7:00 PM

Updated December 7, 2025

Site work and paving for a mixed-use development in Lyndon, Kentucky. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

15% for certified minority owned businesses 5% for certified female owned businesses; and 0.5% for certified handicapped owned businesses. A. The Hall Place Boulevard Connector Project consists of the construction of a new 1,100-foot roadway connecting Beulah Church Road to Cedar Creek Road. The scope of work includes, earthwork and grading, installation of curb and gutter, construction of a new stormwater drainage system, installation of new sidewalks, placement of asphalt base and surface courses. All construction activities shall be performed in accordance with the approved construction plans developed during the planning and design phase. Contractors must adhere to all specifications, standards, and requirements outlined in the project documents. B. The Contract is a unit price project. Estimated quantities appear in the bid schedule only for the purpose of comparing the Bid Proposals. Louisville Metro only will pay the Contractor for the actual quantities of work performed and accepted or materials furnished according to the Contract. Louisville Metro may increase, decrease, or omit the estimated quantities of work and materials furnished. C. The Contract will follow the Kentucky Standard Specifications for Road and Bridge Construction, 2019. Project No. 833973 The Hall Place Boulevard Connector Project consists of the construction of a new 1,100-foot roadway connecting Beulah Church Road to Cedar Creek Road. The scope of work includes earthwork and grading, installation of curb and gutter, construction of a new stormwater drainage system, installation of new sidewalks, placement of asphalt base and surface courses. All construction activities shall be performed in accordance with the approved construction plans developed during the planning and design phase. Contractors must adhere to all specifications, standards, and requirements outlined in the project documents. Questions Due Date: Nov 17th 2025, 3:00 PM EST Questions Online Portal The Expected Start Date with Notice to Proceed for the project is January 5 th, 2026. The Substantial Completion Date for the project is May 21st. 2026 Bidder is required to furnish a Bid (Bid) Bond in an amount of not less than five percent (5%) of its base Bid. This may be in the form of a Bid (Bid) Bond, Certified Check or Cashiers Check. Performance Bond: otherwise supplied, satisfactory to the Metro Government, in an amount equal to one hundred percent (100%) of the contract price as it may be increased Payment Bond: The bond shall be in an amount equal to one hundred percent (100%) of the original contract price.

Post-Bid

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

71

8

32

8

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
136
Bidding Soon
1,794
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2025

January 5, 2026

Project location map

Fox Hall Pl, Lyndon, KY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.