BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 16, 2026 at 7:00 PM

Updated January 17, 2026

Site work and paving for a bridge / tunnel in Whitesville, Missouri. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Question Deadline 11/27/2025 All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 from the current version of the Missouri Standard Specifications for Highway Construction, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. The proposed work includes Construction of an 80 foot long Single Span Steel Girder Bridge and associated roadway work on County Road 90 northeast of Whitesville, Missouri. The right is reserved to reject any or all bids. A DBE goal of 0.0% has been established for this project.

Award

Bridges / Tunnels

$694,254.00

Public - County

Paving, Site Work

18

10

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

January 5, 2026

Project location map

Multiple Locations, Whitesville, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.