Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 13, 2025 at 7:00 PM
Updated December 14, 2025
Site work and paving for a road / highway in Delta, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Region: 3 Counties: Delta Work Days: 70 Us50 Delta Resurface Mp 68.5- Mp 77 This project is located in Region 3 in Delta County. Project work consists of US 50 resurfacing from MP 68.5 - 77. Please contact Nathan Jean at 970-210-9578 for all project related questions. Guaranty: 5% of Total Bid Contract UDBE Goal: 0.00 % CODOT: 002 - Region 3 - US 50 Resurfacing *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This work consists of providing Public Information Management for the duration of the project. The Contractor shall submit all documentation associated with the Public Information Management item to the Project Engineer. Before approval, the Engineer will coordinate review and approval with the Region Communications Manager (RCM). This project takes place on Highway 50 between MP 68.5 and MP 76.85 in Delta County. The project work will include resurfacing, guardrail replacement, and pavement markings. Anticipated communications issues on this project include: o Consistent and timely communication is required with local governments (cities and counties) and stakeholders potentially impacted by the project. o Consistent and timely communication will also be necessary with representatives of known utilities within the project limits, homeowner associations, tourism groups, municipal government entities, and other major organizations or businesses within project limits. o The keys to a successful project shall be accuracy, timeliness of communications, and full transparency on any setbacks. o A celebration may be requested by CDOT HQ to highlight the importance of this project. This work consists of furnishing, installing, certifying, moving, repairing, maintaining, and removing temporary impact attenuators in accordance with these specifications and in conformity with the lines and details shown on the plans or established. This work consists of salvaging topsoil from onsite locations, stockpiling, maintaining, and preparing the subsoils for the placement of the topsoil at locations shown on the plans. It also includes creating seeding media by amending subsoils, and importing offsite topsoil when shown on the plans. This work consists of constructing, installing, maintaining, and removing when required, control measures during the life of the Contract to prevent or minimize erosion, sedimentation, and pollution of any State waters as defined Section 101. Stormwater runoff from all disturbed areas and soil storage areas for which permanent or interim stabilization is not implemented, must flow to at least one control measure to minimize sediment in the discharge. This shall be accomplished through filtering, settling, or straining. The control measure shall be selected, designed, installed, and adequately sized in accordance with good engineering, hydrologic, and pollution control practices. The control measures shall contain or filter flows in order to prevent the bypass of flows without treatment and shall be appropriate for stormwater runoff from disturbed areas and for the expected flow rate, duration, and flow conditions (i.e., sheet or concentrated flow). The Contractor shall coordinate the construction of temporary control measures with the construction of permanent control measures to assure economical, effective, and continuous erosion and sediment control throughout the construction period. When a provision of Section 208 or an order by the Engineer requires that an action be immediate or taken immediately, it shall be understood that the Contractor shall at once begin affecting completion of the action and pursue it to completion in a manner acceptable to the Engineer. This work consists of application of fertilizer, soil amendments, seedbed preparation, and placing seed and sod. Substitutions from this specification will not be allowed unless submitted in writing to the Engineer and approved by the Region or Headquarters Landscape Architect. This work consists of furnishing and applying pavement marking, and furnishing, installing, and removing temporary pavement marking per these specifications, the Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD), the Colorado supplement thereto, and in conformity to the lines, dimensions, patterns, locations and details shown on the plans or established.
Bid Results
Roads / Highways
$7,587,321.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2025
March 17, 2026
US-50, Delta, CO
Related To This Project
Delta, CO
Bid Date: Oct 14 2025
Delta, CO
Bid Date: Oct 10 2025
Delta, CO
Bid Date: Sep 17 2025
Delta, CO
Bid Date: Aug 28 2025
Delta, CO
Bid Date: Sep 17 2025
Delta, CO
Bid Date: Aug 28 2025
Delta, CO
Bid Date: Jul 02 2025
Delta, CO
--
Delta, CO
Bid Date: May 22 2025
Delta, CO
--
Delta, CO
Bid Date: Apr 30 2025
Delta, CO
Bid Date: Apr 11 2025
Delta, CO
Bid Date: Mar 13 2025
Delta, CO
Bid Date: Mar 13 2025
Delta, CO
Bid Date: Mar 13 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
