BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2026 at 7:00 PM

Updated February 5, 2026

Remodeling of a data center facility in Clinton Township, Michigan. Completed plans call for the remodel of a one-story above grade data center facility.

**As of February 4, 2026, the project was awarded to Sentinel Technologies , with an awarded amount of $380,308.07** https://www.wxyz.com/news/macomb-county-residents-pack-zoning-meeting-to-oppose-proposed-data-center Furnish and implement a turnkey solution replacing the firewall at Chippewa Valley School's Data Center. The bid proposal must include the vendor's Universal Service Fund (USF) Service Provider Identification Number (SPIN) current for the 2026 Funding Year. The project may be eligible for Year 29 USF funding, and no invoices will be dated or paid before July 1, 2026. The contract is 100% conditional upon Universal Service Funding, and the District reserves the right to reduce the contract amount or scope to meet budget requirements if the USF discount is reduced. Unit pricing, as specified in the bid proposal, will be used to control contract adjustments. The District reserves the right to specify the reimbursement filing option for implementing E-rate discounts (BEAR or SPI). The E-Rate funding Excel Spreadsheet must be submitted with the original bid response, including manufacturer, part number, quantity, and unit pricing for each component, and bidders must indicate the percentage of E-rate eligibility for each cost. A single lump sum bid proposal is required for the described work. Each bid proposal must include: - A sworn and notarized statement disclosing any familial relationship between the bidder (or employees) and any member of the Owner's School Board or Superintendent. - A sworn and notarized Iran Sanctions Affidavit. - A sworn and notarized Affidavit for Criminal Background Checks. - Bid security in the form of a certified check, cashier's check, or satisfactory surety bid bond in an amount not less than five percent (5%) of the total bid price. Checks must be made payable to Chippewa Valley Schools. In lieu of a Pre-Bid Meeting, prospective vendors may schedule a site visit by contacting Angela Fucich, Metro Technology Services, @ angela@mts4it.com. The Owner reserves the right to accept or reject any or all bid proposals in whole or in part, to waive irregularities or informalities, and to award contracts to bidders other than the low bidder. Bid proposals for the base bid may not be withdrawn for ninety (90) days after the due date. Withdrawal is permitted at any time prior to the due date. Question Deadline 12/05/2025 at 5:00 PM ET Bidder questions to angela@mts4it.com

Award

Data Centers

$380,308.00

Public - City

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
469
Active Projects
282
Bidding Soon
2,320
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2025

July 1, 2026

Project location map

19120 Cass Ave, Clinton Township, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.