BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2026 at 7:00 PM

Updated January 15, 2026

Site work for a communication facility in Auburn, Alabama. Completed plans call for site work for a one-story above grade communication facility.

**As of January 14, 2026, the project was awarded to Thalamus, LLC, with an awarded amount of $383,743.50.** The work includes furnishing all labor, materials, and equipment necessary for the completion of the FY 2025-2026 Fiber Expansion Project. The principal items of work include the installation of 7,065 linear feet of buried duct HDPE DR11, 1.25 inch; 8,751 linear feet of OSP loose tube, 48-fiber single mode cable; and 466 linear feet of drop cable OSP, 6-fiber single mode central core cable. Bidders are required to submit a guarantee with each bid of at least five percent (not to exceed $10,000) of the bid amount in the form of a certified or cashier's check or bid bond, payable to the City of Auburn, Alabama. Bidders must comply with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act regarding employment practices. The successful low bidder is responsible for acquiring appropriate business licenses and permits to work within the City of Auburn. Bids must be good for thirty days after being opened. Bidders should follow all instructions to bidders and be aware the City reserves the right to select the lowest responsible bidder, award the purchase contract from any of the bids, reject any or all bids, and waive any informalities in bids received. - Construction of 48F trunk line and 6F fiber drops to intersections within the City of Auburn. The project will involve installation of conduit, fiber optic cable, splice closures, fiber switches, and fusion splices in accordance with City of Auburn standard specifications and plan documents. Completion- (90) consecutive calendar days ; liquidated damages in the amount of $1,850.00 per calendar day for each day the contract remains incomplete. Project Manager: Justin Lockhart, 334.501.7390

Award

Communication

$383,743.00

Public - City

Site Work

19

5

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
6
Bidding Soon
589
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2025

January 1, 2026

Project location map

To be determined, Auburn, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.