Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 25, 2025 at 7:00 PM
Updated November 26, 2025
Renovation of an educational facility in Florence, Kentucky. Completed plans call for the renovation of a educational facility.
Bidders must deposit with their Bids security in the amount, form, and subject to, the conditions provided in the Bidding Documents. Successful Bidder will be required to furnish a Performance Bond and Payment Bond in an amount of one-hundred percent (100%) of the Contract amount. Question Deadline 11/28/2025 Any interpretation as to design intent or scope shall be provided by the Engineer / Architect. Should an interpretation be required, the bidder shall request clarification not less than ten (10) days prior to the submission of the proposal so that the condition may be clarified by Addendum Remove obstructions, trees, shrubs, and other vegetation to permit installation of new construction. 1. Do not remove trees, shrubs, and other vegetation indicated to remain or to be relocated. 2. Stumps shall be removed in their totality. 3. Chip removed tree branches and dispose of off-site or use for erosion control if allowed. B. Fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated. 1. Place fill material in horizontal layers not exceeding a loose depth of 8 inches (200 mm), and compact each layer to a density equal to adjacent original ground.
GC Bidding
Educational
$100,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 10, 2025
January 9, 2026
7056 Burlington Pike, Florence, KY
Related To This Project
Florence, KY
--
Florence, KY
Bid Date: Dec 11 2025
Florence, KY
Bid Date: Dec 18 2025
Florence, KY
Bid Date: Dec 18 2025
Florence, KY
Bid Date: Dec 01 2025
Florence, KY
Bid Date: Nov 20 2025
Florence, KY
Bid Date: Nov 17 2025
Florence, KY
Bid Date: Nov 28 2025
Florence, KY
Bid Date: Nov 17 2025
Florence, KY
Bid Date: Oct 30 2025
Florence, KY
Bid Date: Oct 30 2025
Florence, KY
Bid Date: Oct 30 2025
Florence, KY
Bid Date: Oct 30 2025
Florence, KY
Bid Date: Oct 30 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
