BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 3, 2025

Site work for a bridge / tunnel in Groton, Connecticut. Completed plans call for site work for a bridge / tunnel.

Amtrak is accepting Letters of Interest for installing Security Countermeasures based on the 100% PE design drawings, including VSS, ACS, gates, lighting, and LIDAR at Thames River Bridge (Amtrak), I-95, Groton, CT 06340 (41.363056, -72.0875). The Contractor shall perform the following tasks: Travel as required to perform research, interview facility personnel, etc. Provide the necessary specifications and obtain approval from the Amtrak Construction/Project Manager before work can begin. Verify and report work conditions of the site(s) prior to commencement of the work. Submit a Site-Specific Safety Work Plan (SSSWP) for approval. Participate and successfully complete Amtrak's Railroad Worker Safety Course (online course at http://amtrakContractor.com). Contractor Safety badges must be worn at all times while on Amtrak-owned or leased property. Perform project management functions, including, but not limited to, conducting bi-weekly meetings with stakeholders, maintaining bi-weekly schedules, and producing submittals, progress reports, and work plans (if deemed necessary by AMTRAK.) Procure and provide for all equipment and materials delivery, storage, and handling. Complete all testing and installation, including necessary infrastructure components. Provide a warranty on installed materials for no less than two (2) years from completion as noted on Final Completion Form signed by Amtrak and the Contractor. Provide required asset tracking information for all installed equipment, including: Make Model Serial # Location within the site Provide an inventory of equipment that was removed and decommissioned. Label and neatly pack all salvaged equipment and deliver to Amtrak. Provide maintenance and care instructions, as-built documentation, and cut sheets for all installed components. *Amtrak does not publicly make available bid tabulations or award information for any of their projects. *

Post-Bid

Bridges / Tunnels

$2,000,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
583
Active Projects
221
Bidding Soon
4,216
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2025

January 30, 2026

Project location map

I-95, Groton, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.