BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a civil project in Las Vegas, Nevada. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

**As of March 20, 2026, the project is on hold. No definite date for the rebid.** The Orchard Collector consists of drainage improvements to capture and convey runoff from Frenchman Mountain into the existing Orchard Detention Basin. Project limits are between Charleston Boulevard and Linden Avenue and located in Section 35, Township 20 South, Range 62 East, M.D.M., Clark County, NV. Clark County Regional Flood Control District Las Vegas Valley Master Plan Update identifies the proposed improvements as Sloan-Orchard SLOR 0158. Improvements include, at a minimum, concrete or roller-compacted concrete channel and levee lining extending from the existing Orchard Detention Basin north inflow channel to the new inflow collector channel terminus approximately 4,230 feet north. Reinforced concrete box is provided under extended roadway alignments and hard lining is proposed at significant inflow locations along the alignment. Additional provisions include maintenance roads, access paths and ramps, fencing, landscaping enhancements, and other necessary appurtenances required to make a complete and serviceable project. Question Deadline 04/29/2026 at 5:00 PM PT ESTIMATED COST: $8,296,473 - $9,169,787. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. ** pre bid info : If your firm is unfamiliar with the County Bid Submittal procedures and would like to obtain training on the submittal process for this Bid, please contact Scott Basquiat-Jones, Purchasing Analyst II, at (702) 455-4441 no later than WEDNESDAY, DECEMBER 3, 2025, and a training session will be provided immediately following the pre-bid conference . A. The work covered by this Section consists of designing the RCC mix and furnishing mixing plant, equipment, materials, and labor; processing, crushing, washing, and stockpiling onsite aggregate; importing material, if required; and performing all labor for the manufacturing, testing, transporting, placing, compacting, and curing of RCC at all locations, including a test section, where RCC lining is shown on the Contract Drawings. B. The CONTRACTOR shall be responsible for administrating a Quality Control Plan for RCC that shall meet the same quality control requirements as the Standard Specifications and special sections included in these Special Provisions. C. The CONTRACTOR shall be responsible for Quality Assurance regarding the consistency and moisture content of the RCC to ensure the material compacts throughout the required lift thicknesses and exposed edges of lifts are devoid of undo segregation or voids. D. A sample RCC mix design was prepared by Terracon, dated February 10, 2025. A PDF version is available for review in the Nevada Gov eMarketplace (NGEM) system https://www.ngemnv.com/. The information in the geotechnical report and subsequent mix designs shall be considered by prospective bidders an example of a lab-controlled mix design prepared using limited samples of onsite material. Aggregate size, consistency, quality, etc., used in the sample shall not be considered comprehensive in nature throughout the project extent where RCC material will be produced.

Bid Results

Water / Sewer

$8,930,000.00

Public - County

Paving, Site Work

53

18

28

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
26
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2026

July 6, 2026

Project location map

Charleston Boulevard and Linden Avenue, Las Vegas, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.