BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2025 at 7:00 PM

Updated November 22, 2025

Site work and paving for a bridge / tunnel in Stevens Point, Wisconsin. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Solicitation Id: NC-01 The structure needs to be replaced and safety will be improved. Rehabilitation project to replace B-49-26, IH 39 NB over the Plover River, in the city of Stevens Point in Portage County. Provide structure alternative analysis for different structure types and configurations to meet the purpose and need, temporary traffic staging alternative analysis, and geometric improvements to the IH 39 NB entrance ramp from USH 10 near the bridge. The consultant is anticipated to take the project to DSR approval and provide final structure plans for PSE. WisDOT is anticipated to take the design from DSR to PSE. Anticipated Construction Cost: $5,000,000-$5,999,999 DBE Goal: DBE Goal in $ 0.00 Anticipated Project Start Date: 04/06/2026 Anticipated Project Completion Date:05/30/2032 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Plainfield - Stevens Point - IH 039N *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Bridges / Tunnels

$5,999,999.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
31
Bidding Soon
463
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2026

Project location map

IH 39, Stevens Point, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.