BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2025 at 7:00 PM

Updated November 23, 2025

This is a service / maintenance or supply contract in Boulder Creek, California. Contact the soliciting agency for additional information.

The San Lorenzo Valley Water District (District) is requesting proposals from qualified consulting firms to prepare the 2025 Urban Water Management Plan Update (UWMP Update) in compliance with the requirements of the California Urban Water Management Planning Act (Water Code Sections 10610-10656) and the Department of Water Resources (DWR) 2025 UWMP Guidebook. The 2025 UWMP Update will build upon the District's existing 2020 Urban Water Management Plan and result in a standalone, updated plan that satisfies all statutory and regulatory requirements for submittal to DWR by **July 1, 2026**. The San Lorenzo Valley Water District (SLVWD), established in 1941, serves approximately 7,900 service connections and a population of about 23,200 across several unincorporated communities in Santa Cruz County, including Boulder Creek, Ben Lomond, Felton, Lompico, and Zayante. The District's water supply is derived entirely from the San Lorenzo River watershed, utilizing a combination of surface and groundwater sources. SLVWD operates two primary service areas: the North Service Area (21.7 square miles) and the Felton Service Area (2.2 square miles). The District relies on nine active surface diversions, one spring, and eight active groundwater wells. Key wellfields include Quail Hollow, Olympia, and Pasatiempo. Water treatment is provided through the Lyon Surface Water Treatment Plant, Kirby Treatment Plant, and associated facilities. The District's rugged topography and dispersed development result in a complex distribution system of thirty-six pressure zones. Storage capacity is limited, requiring near real-time production and treatment management. The UWMP Update will reflect these system characteristics and the ongoing work with the Santa Margarita Groundwater Agency (SMGWA) to ensure sustainable groundwater management under the Sustainable Groundwater Management Act (SGMA). The objective of this project is to update the District's Urban Water Management Plan to: Reflect current population, demand, and supply conditions specific to the District. Incorporate infrastructure improvements, conservation programs, and supply projects. Ensure compliance with DWR's 2025 UWMP submittal requirements. Produce a standalone document for SLVWD that supports long-term water supply planning and regulatory compliance. Prepare all required DWR tables and narratives. **Task 7 - Draft and Final UWMP Preparation** Prepare Administrative Draft and Public Review Draft versions. Assist staff in public review and Board hearing presentation. Revise per comments and prepare Final Adopted UWMP. **Task 8-DWR Submittal and Corrections** Submit final plan electronically through the DWR portal by July 1, 2026. Address any DWR review comments and resubmit final documents. Questions may be directed to: Jason Lillion, General Manager San Lorenzo Valley Water District 13060 Highway 9, Boulder Creek, CA 95006 Phone: (831) 338-2153 email: jlillion@slvwd.com. The District reserves the right to select the proposal that best meets its needs, considering qualifications, approach, and cost. Interviews may be conducted with the highest-ranked firms. A contract award is anticipated in February 2026. The District reserves the right to reject any or all proposals. All materials submitted become the property of the District. The selected consultant will execute a Professional Services Agreement and maintain required insurance coverage.

Conceptual

Water / Sewer

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
350
Active Projects
148
Bidding Soon
2,237
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2026

Project location map

Multiple Locations, Boulder Creek, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.