Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 2, 2026 at 8:00 PM
Updated July 8, 2026
Site work and paving for a bridge / tunnel in Boulder Creek, California. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The County is seeking a qualified consulting firm to provide civil engineering design services for the Fern Drive Bridge Replacement Project (Bridge No. 36C-0071). Fern Drive Bridge is located over the San Lorenzo River and is approximately 4.5 miles north of Boulder Creek in Santa Cruz County. The project will consist of completely replacing the existing structure and roadway approaches with a new 2 lane concrete bridge and bridge approaches meeting current design standards. The existing bridge is a three-span, 71-foot-long reinforced concrete deck on steel girder structure. The Fern Drive bridge is being replaced due to substandard load capacity, deck geometry, approach alignment and structural deficiency. The bridge was deemed "unstable" in April 2025 in the Special Feature Inspection report. Consulting firm services must comply with the latest requirements of the Caltrans Local Assistance Procedures Manual (LAPM), Federal, State, and local regulations. The County is seeking a qualified consulting firm to provide civil engineering design services for the Fern Drive Bridge Replacement Project. Fern Drive Bridge is located over the San Lorenzo River and is approximately 4.5 miles north of Boulder Creek in Santa Cruz County. The project will consist of completely replacing the existing structure and roadway approaches with a new 2 lane concrete bridge and bridge approaches meeting current design standards. The existing bridge is a three-span, 71- foot-long reinforced concrete deck on steel girder structure. The Fern Drive bridge is being replaced due to substandard load capacity, deck geometry, approach alignment and structural deficiency. The bridge was deemed "unstable" in April 2025 in the Special Feature Inspection report. The Fern Drive Bridge Replacement Project was originally advertised in 2012. After the competitive bidding process, TRC Engineers, Inc. (TRC) was contracted to provide civil engineering design services. Many preliminary design tasks were completed before all work was halted on the project while the County shifted focus and resources to storm damage projects after the 2017 winter storms. Work previously completed will be provided to the consultant for design purposes. The bridge is listed in the Highway Bridge Program (HBP) and will be primarily funded through the Federal Highway Administration (FHWA). The remaining funds will be provided by the County local match in cooperation with California Department of Transportation (Caltrans). Consulting firm services must comply with the latest requirements of the Caltrans Local Assistance Procedures Manual (LAPM), Federal , State, and local regulations. Question Deadline 07/14/2026 at 5:00 PM PT Any questions related to this RFP shall be sent through the online e-Procurement Portal above. DO NOT EMAIL INQUIRIES. Question Response Deadline: July 21, 2026, 5:00pm
GC Bidding
$5,000,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Fern Dr, Boulder Creek, CA
Related To This Project
Boulder Creek, CA
Bid Date: May 28 2026
Boulder Creek, CA
Bid Date: Mar 26 2026
Boulder Creek, CA
Bid Date: Feb 25 2026
Boulder Creek, CA
Bid Date: Mar 05 2026
Boulder Creek, CA
Bid Date: Feb 06 2026
Boulder Creek, CA
--
Boulder Creek, CA
Bid Date: Nov 06 2025
Boulder Creek, CA
Bid Date: Nov 21 2025
Boulder Creek, CA
--
Boulder Creek, CA
Bid Date: Sep 26 2025
Boulder Creek, CA
Bid Date: Apr 01 2025
Boulder Creek, CA
Bid Date: Jan 23 2025
Boulder Creek, CA
--
Boulder Creek, CA
Bid Date: Oct 30 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
