BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 23, 2025 at 7:00 PM

Updated November 25, 2025

Demolition, site work, new construction and addition to a mixed-use development in Huntington, West Virginia. Conceptual plans call for the addition of a medical facility; for the demolition of a medical facility; for the construction of a medical facility; and for site work for a medical facility.

Construct Infrastructure Upgrade at Huntington VAMC includes demolition and removal of existing structures, installation of new utility systems, and modernization of facility infrastructure to meet current standards. The work involves upgrading electrical, mechanical, and plumbing systems, improving site utilities, and ensuring compliance with applicable codes and regulations. The project also includes site preparation, excavation, and restoration activities necessary to support the new infrastructure. All work must be performed in accordance with VA specifications, safety requirements, and environmental guidelines. **Location:** Huntington VA Medical Center, 1540 Spring Valley Drive, Huntington, WV 25704. The magnitude of construction is between $20,000,000.00 and $50,000,000.00. The duration of the project is currently estimated at 690 calendar days. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Medical

$50,000,000.00

Public - Federal

Addition, Demolition, New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
42
Bidding Soon
835
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2026

Project location map

1540 Spring Valley Dr, Huntington, WV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.