BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 3, 2026 at 7:00 PM

Updated January 4, 2026

Demolition, site work and new construction of a sidewalk / parking lot in Cocoa Beach, Florida. Completed plans call for the demolition of a one-story above grade sidewalk / parking lot.

City of Cocoa Beach ADA Dune Crossover Replacement Project The scope of this project is to replace the existing ADA dune crossover at the designated site in Cocoa Beach, FL. The project entails the complete demolition and removal of the current structure, followed by the construction of a new ADA-compliant dune crossover with all necessary landings, ramps, handrails, and structural support elements. The new structure at South 7th Street will span approximately 237 feet and at Flagler Lane will span approximately 222 feet in length and will be constructed primarily from Southern Yellow Pine timber, pressure-treated in conformance with the construction drawings for enhanced durability and resistance to coastal environmental conditions. All construction materials, workmanship, and processes shall adhere strictly to the project's design drawings, specifications, and applicable codes and standards. Question Deadline 12/19/2025 Deadline for Written Questions

Post-Bid

Sidewalks / Parking Lot

$400,000.00

Public - City

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
5
Bidding Soon
1,021
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 2, 2026

February 2, 2026

Project location map

Multiple Locations, Cocoa Beach, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.