Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Site work and paving for a civil project in Council Bluffs, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Question Deadline 12/11/2025 at 5:00 PM CT Each proposal shall be accompanied by a certified check, bid bond by a surety company registered to do business in the State of Iowa, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States in the amount of ten percent (10%) of the total bid price and made payable to the City of Council Bluffs. A copy of the certified check, bid bond, or share draft is to be uploaded in the assigned requested attachments area. If a company who has a check is awarded the bid, the City will request the physical check at that time. The certified check or share draft will be returned to the successful bidder once the agreement has been executed. Letters of credit and company or personal checks are not acceptable substitutes for a bid bond and will be cause for rejection of bid. MAJOR ITEMS OF WORK for this project include the following approximate quantities: DIVISION I: GENERAL Traffic Control 1 LS Pavement Removal/Disposition 2410 SY Remove Existing Sanitary Sewer Pipe 1260 LF Remove Existing Storm Sewer Pipe 660 LF DIVISION II: PAVEMENT AND APPURTENANCES 7 inch P.C.C. Pavement 2390 SY Fly Ash Stabilization 2425 SY Subdrain Longitudinal, 4 Inch Dia 1400 LF DIVISION III: STORM SEWER Storm Sewer Pipe, 15 Inch RCP Class III 255 LF Storm Sewer Pipe, 24 Inch RCP Class III 485 LF Storm Sewer Pipe, 48 Inch RCP Class III 42 LF SW-401 72 Inch I.D. Circular Storm Sewer Manhole 16 VF SW-401 84 Inch I.D. Circular Storm Sewer Manhole 9 VF SW-501 Single Grate Intake 10 EA SW-502 60 Inch I.D. Circular Single Grate Intake 2 EA Connect to Existing 24 Inch Storm Sewer Pipe 2 EA Connect to Existing 48 Inch Storm Sewer Pipe 2 E DIVISION IV: SANITARY SEWER Sanitary Sewer Pipe, 21 Inch PVC Main 595 LF Sanitary Sewer Pipe, 10 Inch PVC Main 620 LF Sanitary Sewer Lateral, 6 Inch PVC 500 LF 60 Inch I.D. Circular Sanitary Sewer Manhole (SW-301) 86 VF DIVISION XI: GENERAL Traffic Control 1 LS Pavement Removal/Disposition 160 SY Remove Existing Sanitary Sewer Pipe 140 LF DIVISION XII: PAVEMENT AND APPURTENANCES 7 inch P.C.C. Pavement 170 SY Fly Ash Stabilization 170 SY DIVISION XIII: SANITARY SEWER Sanitary Sewer Pipe, 12 Inch PVC Main 140 LF Sanitary Sewer Lateral, 6 Inch PVC 70 LF 60 Inch I.D. Circular Sanitary Sewer Manhole (SW-301) 15 VF Each bidder's proposal shall include a list of at least three (3) projects completed in the last five (5) years. These projects shall be similar in contract amount and scope of work to the proposed project. Scope of work for the proposed project includes the MAJOR ITEMS OF WORK listed above. Bidders shall also submit with their bid the phone numbers and the names of contact persons for each of the similar projects listed. No bidder may withdraw their proposal within 60 days after the bid opening. The successful bidder will be required to furnish satisfactory performance and payment bonds in the amount of one-hundred percent (100%) of the total bid price, a certificate of insurance and a certificate of equal employment opportunity and comply with minimum wage provisions as established by the U.S. Department of Labor. S. 23rd Street Reconstruction Phase II The start date for the proposed work on S. 23rd Street Reconstruction, Phase II shall not commence until May 27 th, 2026 or later. All work for Phase 1 is to be completed on or before August 14 th, 2026. Remaining work under the proposed contract shall be completed on or before October 16th, 2026. The work under the proposed contract for S. 23rd Phase II shall be completed as detailed in the Instructions to Bidders. 3200 Block Alley Sewer Repair The start date for the proposed work on the 3200 Block Alley Sewer Repair shall not commence until March 15th, 2026, or later. Project shall be completed within 30 calendar days of mobilization with a late start date of April 15th, 2026. The work under the proposed contract for the 3200 Block Emergency Repair shall be completed as detailed in the Instructions to bidders. The City of Council Bluffs reserves the right to reject or accept any or all bids and waive any irregularities in the interest of the City. The City of Council Bluffs pursuant to Iowa Code Section 423.3(80), shall issue a purchasing agent authorization letter and an exemption certificate to the Contractor and Subcontractors for this specific project such that Iowa sales tax will not be paid for materials, supplies, and equipment that will be used in the performance of this specific construction project contract.

GC Bidding

Roads / Highways

$1,370,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

17

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
95
Bidding Soon
948
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

March 12, 2026

Project location map

S 23rd St, Council Bluffs, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.