Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 29, 2026 at 7:00 PM
Updated January 30, 2026
Site work and paving for a mixed-use development in Council Bluffs, Iowa. Completed plans call for site work for a educational facility.
The project involves the removal of existing paving and replacement with new 6" PCC Pavement, 4" PCC Sidewalk, pavement markings, fencing, concrete replacement, and a concrete retaining wall at the Iowa School for the Deaf, 3501 Harry Langdon Blvd, Council Bluffs, IA. The Iowa Department of Administrative Services anticipates construction to begin on April 06, 2026 and end on August 14, 2026. Bids must be submitted on the IMPACS Electronic Procurement System and must be accompanied by a bid security in the amount of 5% of the total bid amount. Each bid must include a bid bond, cashier's check, or certified check drawn upon a solvent bank chartered under U.S. law. Substitute products may be considered if a written request is received prior to bid opening, according to Substitution Procedures. Bidders must comply with all affirmative action and equal employment opportunity provisions of the State of Iowa and the Federal Government. The right to reject any or all bids, waive irregularities, and accept a bid in the state's best interest is reserved. The project is exempt from Iowa Sales Tax and Davis Bacon Wages do not apply. Question Deadline 12/29/2025 at 2:00 PM CT For further information regarding this project contact: Katelyn Howells Issuing Officer Phone: (515)-721-7856 E-Mail: construction.procurement@iowa.gov Scope Applicable to All Bid Packages: 1. The Contractoris Work includes all labor, supervision, materials, equipment, services, supplies, tools, facilities, transportation, hoisting, storage, receiving, licenses, inspections, certifications, overhead, profit, or other items required or reasonably inferable to properly and timely perform and complete all work and services to be performed by the Contractor pursuant to this Agreement. Unless specifically stated otherwise, incidental work required to accomplish the work of this Bid Package shall be included the bid. This would include, but not be limited to, temporary facilities, protection of the work, security of equipment, materials, and work in progress, etc. Contractoris Work shall be performed in accordance with the Drawings, Specification Divisions 00 and 01, and Specification sections applicable to each Contractoris scope. 2. Contractor is responsible for all labor and equipment to unload, account for all material delivered, stock, and delivery for this scope of work. Storage and delivery of materials and equipment at the Site shall be permitted only to the extent approved in advance by the Construction Manager, and if anything so stored obstructs the progress of any portion of the work, it shall be promptly removed or relocated by the Contractor without reimbursement. 3. On site supervision by Prime Contractor at all times work by that contractor or their subcontractors/suppliers is taking place. 4. Provide all temporary facilities required for this scope of work including trailer, trailer power, telephone, secured storage, temporary power for work, temporary and task lighting for work, etc. as determined necessary by Contractor. Coordinate location of trailers, material storage and utility lines with Construction Manager. Limited space is available, and permission to bring any such facility or excess materials on to the site shall be approved by the Construction Manager. 5. Contractor shall provide all equipment and tools for Contractoris own cleanup. Clean up shall be done at end of every shift or more frequently if required for the Contractor to perform their work, for other Contractors to perform their work, as required by the Owneris operations, and at the discretion of the Construction Manager. 6. All turf, landscaping, and subgrade disturbances caused by equipment traffic or other activities related to the Contractoris scope shall be repaired or restored to proper conditions by the Contractor. 7. Protect adjacent existing building elements from damage from Scope of work. Repair existing building elements damaged during Contractoris Scope of work. 8. At minimum, contractors shall provide cleaning of the work area on a daily basis. 9. Repair all grounds and sidewalks damaged during construction.
Award
Educational
$360,021.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 15, 2026
April 6, 2026
3501 Harry Langdon Blvd, Council Bluffs, IA
Related To This Project
Council Bluffs, IA
Bid Date: Jan 09 2026
Council Bluffs, IA
Bid Date: Jan 21 2026
Council Bluffs, IA
Bid Date: Jan 21 2026
Council Bluffs, IA
Bid Date: Feb 10 2026
Council Bluffs, IA
Bid Date: Feb 10 2026
Council Bluffs, IA
Bid Date: Feb 26 2026
Council Bluffs, IA
Bid Date: Mar 05 2026
Council Bluffs, IA
Bid Date: Feb 26 2026
Council Bluffs, IA
Bid Date: Jan 15 2026
Council Bluffs, IA
Bid Date: Jan 22 2026
Council Bluffs, IA
Bid Date: Dec 18 2025
Council Bluffs, IA
Bid Date: Dec 05 2025
Council Bluffs, IA
--
Council Bluffs, IA
--
Council Bluffs, IA
Bid Date: Dec 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
