Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 4, 2026 at 7:00 PM
Updated February 5, 2026
Remodeling of an educational facility in Long Beach, California. Completed plans call for the remodel of a educational facility.
As of February 04, 2026, this project has not yet been awarded. The project is expected to be awarded on February 18, 2026.** https://la.urbanize.city/post/student-housing-takes-shape-compton-college-campus Student housing takes shape on the Compton College campus The project will house 251 homeless and low-income students View Project January 19, 2026, 6:05AMSteven Sharp 2 Comments Gallery5 Advertisement After one year of construction, all prefabricated modular units are now in place for a new student housing complex at the Compton College campus, per a social media post from the school. The project, which broke ground in early 2025, is located on a 2.8-acre site along Main Campus Drive to the south of Greenleaf Boulevard. The new construction consists of interconnected three-story structures which will feature 151 one- and two-bedroom suites, providing room for up to 251 homeless and low-income students. Courtyard of Compton College Student HousingHPI Architecture HPI Architecture is designing the project, which will be centered on a landscaped central courtyard. Completion is expected in Summer 2027. Site plan for Compton College Student HousingCCCD The project is funded in large part by grants totaling more than $80 million under AB 183 . Total project budget is $83 million. Other local community colleges, including Long Beach Community College, have also moved to build housing on their campuses. A 2024 report concluded that one quarter of California community college ------------------------------------------------------ The Project consists of tenant improvements throughout Building O2, including new paint and flooring, wall graphics, casework, signage, window coverings, and digital signage in the main lobby. All work is interior, and no bathroom upgrades are included. Question Deadline 12/15/2025 at 10:00 AM PT Online Q&A Yes . All questions are to be submitted through online. The District will not respond to any bidder inquiries or clarification requests, unless such inquiries or clarification requests are timely submitted via online. Liquidated Damages $1,000 per Calendar Day Project Duration: 260 calendar days Response Types Line Items Type of Award Lump Sum License Requirement: At the time bids are submitted, each Biddershall possess a valid California Contractor License B - General Building, by the contractor or one of its subcontractors, and must maintain the license(s) throughout the duration of the project. All designated subcontractors will also be required to have current and active CSLB licenses atthe time of submissionofthe bid and throughoutthe durationofthe project.
Post-Bid
Educational
$765,000.00
Public - City
Remodeling
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 12, 2026
February 11, 2026
4900 E Conant St, Long Beach, CA
Related To This Project
Long Beach, CA
Bid Date: Dec 08 2025
Long Beach, CA
Bid Date: Dec 03 2025
Long Beach, CA
--
Long Beach, CA
Bid Date: Jan 08 2026
Long Beach, CA
Bid Date: Dec 18 2025
Long Beach, CA
Bid Date: Jan 13 2026
Long Beach, CA
Bid Date: Jan 29 2026
Long Beach, CA
Bid Date: Jan 26 2026
Long Beach, CA
Bid Date: Jan 12 2026
Long Beach, CA
Bid Date: Jan 20 2026
Long Beach, CA
Bid Date: Jan 07 2026
Long Beach, CA
Bid Date: Nov 24 2025
Long Beach, CA
Bid Date: Dec 16 2025
Long Beach, CA
Bid Date: Dec 09 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
