BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2026 at 7:00 PM

Updated February 5, 2026

Remodeling of an educational facility in Long Beach, California. Completed plans call for the remodel of a educational facility.

As of February 04, 2026, this project has not yet been awarded. The project is expected to be awarded on February 18, 2026.** https://la.urbanize.city/post/student-housing-takes-shape-compton-college-campus Student housing takes shape on the Compton College campus The project will house 251 homeless and low-income students View Project January 19, 2026, 6:05AMSteven Sharp 2 Comments Gallery5 Advertisement After one year of construction, all prefabricated modular units are now in place for a new student housing complex at the Compton College campus, per a social media post from the school. The project, which broke ground in early 2025, is located on a 2.8-acre site along Main Campus Drive to the south of Greenleaf Boulevard. The new construction consists of interconnected three-story structures which will feature 151 one- and two-bedroom suites, providing room for up to 251 homeless and low-income students. Courtyard of Compton College Student HousingHPI Architecture HPI Architecture is designing the project, which will be centered on a landscaped central courtyard. Completion is expected in Summer 2027. Site plan for Compton College Student HousingCCCD The project is funded in large part by grants totaling more than $80 million under AB 183 . Total project budget is $83 million. Other local community colleges, including Long Beach Community College, have also moved to build housing on their campuses. A 2024 report concluded that one quarter of California community college ------------------------------------------------------ The Project consists of tenant improvements throughout Building O2, including new paint and flooring, wall graphics, casework, signage, window coverings, and digital signage in the main lobby. All work is interior, and no bathroom upgrades are included. Question Deadline 12/15/2025 at 10:00 AM PT Online Q&A Yes . All questions are to be submitted through online. The District will not respond to any bidder inquiries or clarification requests, unless such inquiries or clarification requests are timely submitted via online. Liquidated Damages $1,000 per Calendar Day Project Duration: 260 calendar days Response Types Line Items Type of Award Lump Sum License Requirement: At the time bids are submitted, each Biddershall possess a valid California Contractor License B - General Building, by the contractor or one of its subcontractors, and must maintain the license(s) throughout the duration of the project. All designated subcontractors will also be required to have current and active CSLB licenses atthe time of submissionofthe bid and throughoutthe durationofthe project.

Post-Bid

Educational

$765,000.00

Public - City

Remodeling

169

22

43

10

Subscribe For Documents

112 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
707
Active Projects
283
Bidding Soon
3,490
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2026

February 11, 2026

Project location map

4900 E Conant St, Long Beach, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.