BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 16, 2026 at 7:00 PM

Updated January 17, 2026

Site work for a water / sewer project in Lake Buena Vista, Florida. Completed plans call for site work for a water / sewer project.

Central Florida Tourism Oversight District (CFTOD) is seeking the services of a qualified contractor to replace, in kind, both AMIL gates at Water Control Structure S-405A. Minimal repairs will be performed on the concrete portions of this water control structure to create a watertight seal. The bearing housing units are to be removed from the existing gate and provided to CFTOD Planning & Engineering before gates are removed off site for disposal. In addition, the existing eastern safety chain post has been removed and will need to be replaced. The ladder safety handrail has been bent and is to be realigned. The Structure S-405A is a dual AMIL (automatic water control structure) gate structure that has an upstream control elevation of 96.00-ft. This structure is a Waterman Industries Model C-12 Constant Upstream Level Gate with a maximum gate opening of 2'-0.84". This structure was constructed in the late 1960's and has been in continuous use since installation. Basis of award is the low bidder of the total of all line items. Florida Statute 287.05701- Pursuant to Florida Law, the District may not request documentation of or consider a vendor's social, political, or ideological interests when determining if the vendor is a responsible vendor, or give preference to a vendor based on the vendor's social, political, or ideological interests. To ensure fair consideration for all Bidders, the District strictly prohibits any communication, whether or not written, verbal, or through a third party, relative to this solicitation with any department, District official, District Board member, or employee during the active bid process, except inquiries directly made to the Procurement Department, or as provided in the protest policy. Question Deadline 01/02/2026 at 6:00 PM ET Online Q&A Yes Response Types Line Items Bid Bond 5.00% Payment Bond 100.00% Performance Bond 100.00% Type of Award Lump Sum License Requirements FL General Contractor License Liquidated Damages $2,667 Per Calendar day past Substantial Completion Project Duration 350 days from NTP (8 months to Substantial, 9 months to Final) The Scope of Work shall include translating the contract scope of work intoa specificdetailed work plan. It shall identify location(s), means and methods of acco mplishing the plan, anticipated sequence of events, equipment tobe used, etc. Please no tethat thisincludes allwork tobe performed by the Contractor and Subcontractors of every tier. The scope shall also identify the following: o Maximum height and depthof work activities o Industrial hygiene issues o Exposure tohigh hazard areas including but not limited to: o Water Ways o Diving o Crane Lifts o Energized Electrical Systems o Confined Spaces o Maintenance Of Traffic("MOT") / Temporary Traffic Con trol ("TTC") o Guest Area A. Measure for new AMIL gates. B. Order Gates. C. Contractor shall establish survey control on site, using the local Disney Datum. D. Prepare and install the approved erosion and turbidity control plan. E. Install non-erosive cofferdam systems. F. Set up approved dewatering pumping to maintain work area. G. Provide as-built plans demonstrating the installation elevation of the cofferdam systems. H. Contractor to clean sluice wall and gate seat floor approximately 3-ft either side of gate. Once walls and floor are cleaned Contractor and CFTOD P&E Staff shall inspect the walls and determine locations to be repaired. I. Gates are to be replaced one at a time. Replace the existing AMIL gate and repair any damage to sluice wall adjacent to gate. Seal all repaired concrete surfaces. J. Balance gates in coordination with CFTOD staff and verify final balance with Waterman staff onsite. Counter-balance weight may vary. K. Remove the bearing housing units from the old gates and provide to CFTOD Planning and Engineering before gates are removed off-site for disposal. Note, the gate must be removed in order for the bearings to be able to be removed. L. Provide the pin elevation, by a surveyor licensed in the state of Florida. M. Replace the missing safety chain post and realign the ladder safety handrail back into place. See Exhibit J for photo of these elements. Contractor to minimize impacts to the wingwall. N. Remove pumping and cofferdam systems. O. Restore site.

Bid Results

Water / Sewer

$1,806,600.00

Public - County

Site Work

4

28

8

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
188
Bidding Soon
2,756
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2026

March 11, 2026

Project location map

Multiple Locations, Lake Buena Vista, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.