BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Site work and paving for a road / highway in Norwalk, Ohio. Completed plans call for site work for a one-story above grade road / highway.

**As of February 6th, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** Sealed bids may be submitted for the Hartland Center Road Improvements Phase 1 :- Improvements including road resurfacing from the railroad tracks located south of SR 18 to US 20 (13,800 ft. x 20 ft avg). Improvements also include pavement marking, guardrail removal/installation, trench repair and rumble strip removal. Bid documents, including contract terms and conditions, must be obtained for a non-refundable fee from the specified location. Each bidder is required to furnish a Bid Guaranty and Contract Bond as per Ohio Revised Code. Proposals must contain the full name of all parties involved and evidence of experience on similar projects. The project is to be completed by the specified date. Bidders must comply with prevailing wage rates as determined by the Ohio Department of Commerce. Bid documents must be obtained from the specified office, and copies will not be accepted; all documents must be submitted bound in their entirety. The Board reserves the right to waive irregularities and reject any or all bids. The Contractor shall furnish, at its own cost and expense, all management, labor, tools, forms, equipment, appliances, machinery, transportation, materials and other things necessary, of whatever nature, to perform the Work, and shall perform and complete, within the time limit specified, all ofthe Work indicated or implied by the including the Notice to Bidders, Instructions to Bidders, General & Supplemental Provisions, Standard Specifications, Scope ofWork, Plans & Specifications, and Estimated Quantities prepared forthis Project, including the removal ofsurplus or condemned materials, and the thorough cleaning ofthe site ofthe Work and structures built. this project consists of the improvement of 13,800 ft. of hartland center road from the railroad (south of state route 18) to u.s. route 20 in townsend township. Start Date: Mid-July, 2026 Completion Date: October 9, 2026 Engineers Estimate $495,000.00

Bid Results

Roads / Highways

$472,578.00

Public - County

Paving, Site Work

16

6

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
362
Active Projects
203
Bidding Soon
2,409
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

July 15, 2026

Project location map

Hartland Center Rd, Norwalk, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.