Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 14, 2026 at 7:00 PM
Updated January 15, 2026
Renovation of a detention facility in Toledo, Ohio. Completed plans call for the renovation of a 2,682-square-foot detention facility.
Description Toci Secure Recreation Areas Toledo Correctional InstitutionThe project, located in Toledo, Ohio, will involve the addition of new metal shower units in the existing shower rooms. New interior metal recreation areas are also to be constructed. minor plumbing and electrical work shall include new sprinkler heads will be installed as required and light fixtures to be relocated. THE PROJECT, LOCATED IN TOLEDO, OHIO, WILL INVOLVE THE ADDITION OF NEW METAL SHOWER SECURE AREAS IN THE EXISTING SHOWER ROOMS, IN AN EXISTING CORRECTIONS FACILITY AT THE LOCATIONS SHOWN ON THE FLOOR PLANS. NEW INTERIOR METAL SECURE AREAS ARE ALSO TO BE CONSTRUCTED. MINOR PLUMBING AND ELECTRICAL WORK SHALL INCLUDE NEW SPRINKLER HEADS, INSTALLED AS REQUIRED, AND LIGHT FIXTURES TO BE RELOCATED. NO HVAC WILL BE INVOLVED More Info: Star Consultants, Inc Name, Ali Alghothani , AE phone (614) 538-8451 or Email: ali@starconsultants.org The A/E shall respond to RFIs received more than 7 days before the bid opening This project, located in Toledo, Ohio, will involve the construction of: stainless steel shower cages at two (2) locations, and Indoor Recreation cages at two (2) locations. The scope shall include but not limited the relocation of existing light fixtures and the addition of two sprinkler heads in the shower area.
Award
Jails / Prisons
$885,950.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 30, 2025
January 29, 2026
2001 E Central, Toledo, OH
Related To This Project
Toledo, OH
Bid Date: Jan 06 2026
Toledo, OH
Bid Date: Jan 06 2026
Toledo, OH
Bid Date: Jan 13 2026
Toledo, OH
Bid Date: Feb 24 2026
Toledo, OH
Bid Date: Jan 06 2026
Toledo, OH
Bid Date: Dec 23 2025
Toledo, OH
Bid Date: Dec 29 2025
Toledo, OH
Bid Date: Jan 05 2026
Toledo, OH
Bid Date: Dec 16 2025
Toledo, OH
Bid Date: Dec 19 2025
Toledo, OH
Bid Date: Dec 16 2025
Toledo, OH
Bid Date: Dec 16 2025
Toledo, OH
Bid Date: Dec 09 2025
Toledo, OH
Bid Date: Dec 09 2025
Toledo, OH
Bid Date: Dec 09 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
