BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2026 at 7:00 PM

Updated February 4, 2026

Renovation of an educational facility in Storrs Mansfield, Connecticut. Completed plans call for the renovation of a educational facility.

Motor Pool Fuel Tank Replacement project Remove the existing UConn Motor Pool Fueling Station, and deliver a fully operational fueling system comprised of two (2) 10,000 gallon underground storage tanks (USTs), one for gasoline and the other for diesel, associated piping, leak detection, Stage I vapor recovery, electrical and controls, integration with current usage monitoring system, civil/site restoration, and turnover training PROJECT SCHEDULE/DURATION: o Anticipated Contract Issuance/Notice to Proceed: April 2026 o Construction is planned to start: May 1, 2026 o Construction Duration: 1 year SELF-PERFORMANCE REQUIREMENT: If awarded this contract, the Contractor shall be required to perform not less than ten percent (10%) of the Total Contract Price with its own forces. GOOD FAITH EFFORTS PLAN: The Spending Allocation Goal for this Project is that (1) not less than thirty percent (30%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Small Business Enterprises" ("SBEs") and (2) not less than ten percent (10%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Minority Business Enterprises" ("MBEs") (the 10% Spending Allocation Goal for MBEs may be included in the 30% Spending Allocation Goal for SBEs). If the Contractor is an S/MBE, then any self-performed work may be included in the Spending Allocation Goal, however, self-performing MBE's must still demonstrate good faith efforts to employ other MBEs as subcontractors and supplier of materials. The Contractor is responsible for ensuring that they, and the S/MBEs they have selected, are eligible Connecticut-certified S/MBE contractors. Failure to make good faith efforts will be subject to enforcement that may lead to withholding of contract payments, disqualification from future bidding, and/or civil penalties and legal action by CHRO. For further information see: CHRO's Contract Compliance Program

Post-Bid

Educational

$1,000,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
896
Active Projects
442
Bidding Soon
4,825
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2026

May 1, 2026

Project location map

9 Discovery Dr, Storrs Mansfield, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.