Published December 18, 2025 at 7:00 PM

Updated December 19, 2025

Asbestos abatement and renovation of an educational facility in Dekalb, Illinois. Completed plans call for the renovation of a educational facility; and for asbestos abatement for a educational facility.

The work is a Base Bid - Phase 1 - 2026 to remove flooring in three contained areas May 26, 2026 - July 2, 2026 and an Alternate Bid Phase 2 - 2027 that adds to the Base Bid removal of flooring in one contained area June 1, 2027 - June 16, 2027. PROJECT INFORMATION THE WORK OF THE PROJECT: Base Bid: Phase 1 - 2026 - Containment A Remove floor tile and associated mastic (approximately 7,715 square feet), carpet and associated mastic (approximately 4,390 square feet), and stair treads and associated mastic (approximately 40 square feet) from the southern portion of the commons, band room area, and the southeast corridors utilizing gross removal methods. Phase 1 - 2026 - Containment B Remove floor tile and associated mastic (approximately 8,760 square feet) from the northern portion of the commons and the northeast portion of the building utilizing gross removal methods. Phase 1 - 2026 - Containment C Remove floor tile and associated mastic (approximately 7,915 square feet) from the southern and western corridors utilizing gross removal methods Alternate Bid: Phase 2 - 2027 Add to the Base Bid the removal of floor tile and associated mastic (approximately 6,345 square feet) from the second floor corridors utilizing gross removal methods EXISTING CONDITIONS: Demolition activities are not necessary to make materials that are scheduled for removal accessible. Disruption of the existing systems must be scheduled and coordinated with the Owner. The Owner will continue to utilize portions of the building during completion of Contract Work. Engineer and Contractor shall not be responsible for weather intrusion, vandalism, injury, or any other issues caused due to the absence of materials being removed. Contractor shall not be held responsible for pre-existing damage to the substrate material(s) under the flooring scheduled for removal as the condition of the material is not known. There may be cracks, gouges and/or pits present. Contractor shall be responsible for damage to the substrate material(s) determined by the Engineer to have been caused by the Contractor. Contractor shall only perform activities necessary for asbestos removal and associated disposal, as specified in this Project Manual. No scrapping, recycling, removal of building components or furnishings will be permitted. No inquiries or exceptions will be allowed. Contractor shall be responsible for all costs associated with any unauthorized activity.

Bid Results

Educational

$234,844.00

Public - City

Asbestos Abatement, Renovation

6

7

9

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
3
Bidding Soon
2,240
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2025

May 26, 2026

Project location map

1515 S 4th St, Dekalb, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.