BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Site work and paving for a mixed-use development in Shakopee, Minnesota. Conceptual plans call for site work for a playground / park / athletic field; road / highway; and for paving for a road / highway.

Southbridge Park is a 40-acre area that includes paved and gravel trails, an outdoor ice rink, and a large dog park. There are roughly 25 acres of wooded area dominated by oak species, mainly of the red oak group. Other native species present include black cherry, hackberry, cottonwood, and cedar. The hackberries and cottonwoods are found in the lower, wetter areas of the park and bordering the wetland. The cherries and cedars are scattered throughout. This park has also been invaded by common buckthorn and nonnative honeysuckle. Buckthorn and honeysuckle are woody invasives that form dense stands that can completely alter the understory composition of a forest, overtaking the native vegetation. This reduces habitat for wildlife and can contribute to reduced soil stabilization. Additionally, the oaks in this park are being devastated by oak wilt. Oak wilt is a fungal disease that infects oak trees cellular vessels, reducing the uptake of water by the infected tree. If no action is taken to restore this area, the current stand of oak trees will continue to die and be cut down with nothing replacing them. This would open the canopy, resulting in a loss of the woodland landscape. The goals for this project are to mitigate the impacts of tree loss due to oak wilt and provide a high quality, usable natural area to residents. This will be done through removal of the dead and dying oak trees, removal of woody invasives, planting native grasses and reforestation. The project is included in the City's 2026-2030 Capital Improvement Program (CIP). As of December 4, 2025, construction is funded for 2026-2028. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Playgrounds / Parks / Athletic Fields

$675,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
127
Bidding Soon
1,517
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

Project location map

7101 Southbridge Pkwy, Shakopee, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.