BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated December 16, 2025

Site work for a playground / park / athletic field in Middlefield, Massachusetts. Completed plans call for site work for a playground / park / athletic field.

The successful contractor will furnish and install a new Playground System at 172 Skyline Trail in Middlefield, MA per the Bid specifications including equipment, a new border system around new and existing equipment and related work. The Contractor will supply and install anew playground system per bid specs. and will install border timbers and related work. The deadline for questions on the documents is December 15, 2025 at 5:00 PM ET . Questions should be directed to the Town Administrative Assistant at middlefield.assistant@gmail.com. There is no scheduled site visit for this project. It is suggested that Bidders visit the site located at 172 Skyline Trail adjacent to the Middlefield Senior Center. The successful bidder must only use outdoor equipment, materials, furnishings, that are appropriate for children 5 to 12 years of age and must meet the needs, and development level for the age group. The successful bidder will be responsible for providing playground equipment based upon the enclosed Bayou Vista Playground System plan manufactured by NVB Playgrounds located at 3876 North, 700 West in Greenfield, Indiana 46140 Tel: 187-826-2776 or approved equal. The successful Bidder will provide erect and install all elements of the new playground system, full playground ramp, install weed preventing geodesic textile cloth barrier on all areas to receive safety wood chip mulch, and install new border timbers to hold safety wood chip mulch per the guidelines that are 52 inches long x 12' high x 4" wide including installation pins encompassing the new playground system and existing play areas shown on schematics in the Bid documents. The approved design must meet and comply with Massachusetts safety, accessibility, and construction guidelines for the installation of playground equipment. The proposed equipment must include elements that also meet state accessibility guidelines. The playground will also include 1 ADA half ramp to access the ADA area of the playground as shown on the attached schematics. The actual location of the installation of the ramp will be determined on site. Accessible features must be able to meet a paved walk that will be constructed by others. The site for the playground will be prepped by others including the removal of existing playground equipment, supplying and installing all safety bark mulch. The playground area will be leveled, and all debris will be removed by others as part of preparing the site.

GC Bidding

Playgrounds / Parks / Athletic Fields

$50,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
468
Active Projects
176
Bidding Soon
3,257
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2025

January 21, 2026

Project location map

172 Skyline Trail, Middlefield, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.