BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 22, 2025 at 7:00 PM

Updated December 23, 2025

Site work for a power facility in Los Angeles, California. Completed plans call for site work for a one-story above grade power facility.

The scope of work involves providing a transformer, three phase, 34.5kV - 240/120V, 500kVA platform mounted, substation type, for above-ground installation, in accordance with the attached drawing and specifications. The vendor must submit drawings and specifications by the bid due date, including details for any additional support structure if used. Delivery shall not exceed 133 calendar days from receipt of order. The item must be matched and intermembered with equipment now in use. Bidders are required to provide a complete detailed description for each item including manufacturer name and part number even if matching the specified item. Vendors quoting other than the specified manufacturer/brand or part number must submit and attach literature/specifications with the bid. Only responses submitted through ERSP will be accepted. Bidders must enter prices and provide all requested information as listed after the bid line items. Delivery will only be accepted between 7:30 A.M. and 2:30 P.M., Monday to Friday, excluding recognized holidays. Payment will be made 30 calendar days after delivery and receipt of a correct invoice. All forms required at bid submittal and associated documents are located on the "vendor checklist" page of the ERSP system and must be downloaded and submitted electronically prior to the bid closing date and time. Question Deadline 12/18/2025 at 2:00 PM PT Email: Jose.Perezlara@ladwp.com Description: a. Three-phase unit substation type b. Power: 500KVAA c. High voltage: 34500 V delta, 200kV BIL d. Low voltage: 240 V delta/ 120 V tap, 30 kV BIL e. Frequency: 60 Hz f. Average winding rise: 65 C g. Ambient temperature: 30 C h. 500kVA ONAN rated. i. Impedance: 5.7% max j. Liquid filled type, mineral oil k. Core: Grain oriented steel, low TOC silicon core l. Bushings: HV live cover (top) mounted, 4-hole NEMA spade terminals; LV live front mounted, 6-hole NEMA spade terminals m. Compliant with the current Department of Energy Efficiency standard n. Color: durable, corrosion resistant finish shall meet or exceedsthe requirements of ANSI C57.12.28 o. Grounding: two 2-hole NEMA tank ground pads on opposing edges of the tank. p. Exterior paint: ANSI # 70, gray color. q. Nameplate: on tank r. Dimensions: Width and depth must conform to the limitation provided in the attached drawing and shall include the cooling fins when they are furnished. Height dimension must comply with NESC rule 124A3 and shall include HV bushing when they are furnished. Where pedestal is used to comply with this requirement, it shall meet all mandatory seismic standards. s. Noise: Average audible noise shall not exceed 58-dB(A). t. Earthquake design: the equipment shall withstand earthquake forces of 0.5g in either horizontal or vertical direction. Monitoring: a. Thermometer: dial type with 2 contacts b. Liquid level gauge c. Pressure relief valve d. Provisions for pressure/vacuum gauge e. Control box / cabinet Fittings: a. Drain valve and sampler b. Upper filter press connection c. Lifting lugs with pulling eye: four d. Jacking provisions with pulling eye: four e. Provisions for top filter press connection.

Sub-Bidding

Power Plant

$100,000.00

Public - City

Site Work

3

4

2

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
594
Active Projects
204
Bidding Soon
3,601
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2026

January 21, 2026

Project location map

1212 Palmetto St, Los Angeles, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.