BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2026 at 7:00 PM

Updated January 9, 2026

Site work and new construction of a pre-engineered storage facility in Forestville, California. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The Work of this Contract may consist of the following New modular 12' X 24' storage shed and 28' x 28' headhouse - for staff use only and for non-educational use. Storage shed and headhouse is owner furnished and owner installed (O.F.O.I). Building pad and subgrade preparation shall be by Contractor. Minor electrical work at headhouse. Add lighting, power outlets, and connection for ceiling fans. Minor plumbing work at headhouse. Add outdoor utility sink, interior hose bibb, and catch basin brain. Sitework: new concrete paving around buildings This is an Invitation to Bid for the Shone Farm New Storage Shed & Headhouse project. The project licensing requirement is B (General Building). Vendor is responsible for downloading all applicable documents included in this bid event. Question Deadline 01/02/2026 at 2:00 PM PT Additional vendor technical questions must be submitted via email to Linda Mao at linda@finneyarchitects.com . This is a CUPCCAA bid for pre-qualified CUPCCAA contractors. Pre-qualification requirements: Pre-qualified CUPCCAA contractors with a B (General Building) license are required. Each bidder shall possess at the time the bid is awarded the following classification(s) of California State Contractor's license: B -General Building The Bidder's Bond executed by a surety licensed to do business in the State of California as a surety, made payable to the district, in an amount not less than ten percent (10%) of the maximum amount of the bid must be attached to the vendor's response. Time of completion for this project is fifty-six (56) working days from NTP, which includes one week of Tuff Shed installation by others. Liquidated damages are $500 per day.

GC Bidding

Warehouse / Distribution - Pre-Engineered Storage Building

$105,000.00

Public - County

New Construction, Site Work

27

14

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
297
Active Projects
137
Bidding Soon
1,898
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2026

February 16, 2026

Project location map

7450 Steve Olson Ln, Forestville, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.