BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 22, 2025 at 7:00 PM

Updated December 23, 2025

Site work and paving for a civil project in State College, Pennsylvania. Completed plans call for site work for a one-story above grade road / highway; and one-story above grade water / sewer project.

This project consists of complete utility infrastructure replacement and roadway reconstruction on Calder Way adjacent to Hetzel Street, including pavement structure replacement, curb and curb/gutter, driveway aprons, ADA curb ramps, sanitary sewer main and lateral replacement, storm sewer improvements, waterline and water service replacements, conduit duct bank installation and all required appurtenances as shown on the Contract Drawings. -The Project consists of the complete infrastructure system replacement (sanitary, storm, water, electric, etc.) and roadway reconstruction on Calder Way adjacent to Hetzel Street. Bid Documents may be obtained at the office of the Borough Engineer for a $30 deposit fee, refundable upon return of all forms and plans, clean and intact, by the time of bid opening. Bids must be sealed and plainly marked on the outside, addressed to the Borough Manager, and in his possession prior to bid opening. Each bid is to be accompanied by a non-collusion affidavit and a certified check or bid bond in the amount of ten percent (10%) of the amount bid and made payable to the Borough. Bids shall remain irrevocable for 60 days after opening, or up to one hundred twenty days if the award is delayed due to specific approvals or grant proceedings. All bids are to be sealed and plainly marked on the outside, "BID ON PROJECT #SS222-02-2025", addressed to the Borough Manager, Thomas J. Fountaine, II, 243 South Allen Street, State College, PA 16801 and be in his possession prior to 11:00 AM on December 16, 2025. Bid Award - January 12, 2026 - Notice to Proceed - April 2, 2026 - Start Work - April 2, 2026 - July 30, 2026 Substantial Completion - 120 days from Notice to Proceed Schedule Provisions Q/A- Resolution of Discrepancies and/or Ambiguities. All questions pertaining to the meaning or intent of Bid Documents shall be directed to the Borough Engineer up until close of business 4 business days before the Bid Opening date. Questions received after this date will not be answered.

Bid Results

Roads / Highways

$1,950,875.00

Public - City

Paving, Site Work

43

8

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
106
Bidding Soon
816
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2025

April 2, 2026

Project location map

Hetzel St & E Calder Way, State College, PA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.