BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 12, 2026 at 7:00 PM

Updated February 19, 2026

Renovation of a detention facility in Mescalero, New Mexico. Completed plans call for the renovation of a detention facility.

This acquisition is for a Design/Build Construction Contract to bring the Mescalero Adult Detention Center to full and functional completion. The scope of work includes various Facility Improvements and Repair (FI&R) activities such as design, construction, installation, and demolition. The project aims to ensure the facility meets operational standards and requirements. Magnitude: The estimated construction cost is between $500,000 and $800,000.Questions and Answers: Any questions relating to this solicitation shall be submitted to the Contracting Officer (CO), Laurie Sherrod, at laurie.sherrod@bia.gov no later than January 29, 2026. All interested contractors shall RSVP to participate in the available site visit NLT 12:00 P.M. ET on Monday, January 26, 2026. RSVPs will be received at laurie.sherrod@bia.gov. Upon receipt of the RSVP the calendar invite with a call-in link will be provided. If no RSVPs are received by 12:00 P.M. ET on Monday, January 26, 2026, the call will not take place, the onsite tour will not be provided, the formal site visit will be cancelled, and an RFP amendment will be posted confirming cancellation of the site visit. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The newly constructed Mescalero Adult Detention Center is a Bureau Operated 40-bed Detention Facility located at 386 Sawmill Dr. Mescalero, NM 88340 in the Southwest Region on the Mescalero Apache Reservation. Prior to occupancy, the Bureau of Indian Affairs (BIA) Office of Justice Services (OJS) requires modifications and improvements to the building to support full operational capabilities. The objective of this project is the full and functional completion of the work items listed in Section D. This scope includes various Facility Improvements & Repair (FI&R) activities including but not limited to design, construction, installation, and demolition. The Contractor shall furnish all materials, equipment, and personnel necessary to manage and accomplish the FI&R activities outlined within for the Mescalero Adult Detention Center. The Contractor's work responsibility shall include all planning, administration, coordination, and management necessary to provide the deliverables as specified. The work shall be conducted by the Contractor in strict accordance with the contract and all applicable Tribal, Federal, State, and local laws, regulations, codes, or directives. The Contractor shall provide related services such as project development, project management, quality control, preparation, review, and submission of required deliverables, along with other administrative work required to satisfy the requirements specified under this contract. The following general work requirements shall also apply. 1. Field verify all existing conditions, utilities, dimensions, and clearances impacted by the work. 2. Notify the Contracting Officer (CO) and the Contracting Officer's Representative (COR) of any deficiencies or other potential out of scope conditions encountered. 3. Coordinate work with applicable codes and the BIA Justice/Detention Facilities Design Handbook requirements. 4. The Contractor shall provide all labor and materials required to complete the work - refer to Section D, Task Identification. 5. All installations are to be detention grade equipment. 6. All waste materials shall be removed and disposed of in a manner as specified by local, State, and Federal regulations. RFP Ques and Ans Log - Feb 10, 2026

Post-Bid

Jails / Prisons

$800,000.00

Public - Federal

LEED Certification, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

20

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2026

October 20, 2026

Project location map

386 Sawmill Dr, Mescalero, NM

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.