Site work for a bridge / tunnel in Anamosa, Iowa. Completed plans call for site work for a one-story above grade bridge / tunnel.
The work involves emergency repairs to the utility tunnel lid outside of Living Unit D at Anamosa State Penitentiary, Anamosa, Iowa. Bids must be submitted on the IMPACS Electronic Procurement System and accompanied by a bid security equal to 5% of the total bid amount, in the form of a bid bond, cashier’s check, or certified check drawn on a solvent U.S. bank. Bidders must comply with all affirmative action/equal employment opportunity provisions of the State of Iowa and the Federal Government. The project is exempt from Iowa Sales Tax. Davis Bacon Wages do not apply. Substitute products may be considered if written requests are submitted prior to the bid opening and according to substitution procedures. The bidding documents specify the project and product requirements, and bidders are advised to review these documents for further details on qualifying products, substitution, and bid submission procedures. BID SCOPE SUMMARY A. Scope Applicable to All Bid Packages: 1. The Contractor’s Work includes all labor, supervision, materials, equipment, services, supplies, tools, facilities, transportation, hoisting, storage, receiving, licenses, inspections, certifications, overhead, profit, or other items required or reasonably inferable to properly and timely perform and complete all work and services to be performed by the Contractor pursuant to this Agreement. Unless specifically stated otherwise, incidental work required to accomplish the work of this Bid Package shall be included the bid. This would include, but not be limited to, temporary facilities, protection of the work, security of equipment, materials, and work in progress, etc. Contractor’s Work shall be performed in accordance with the Drawings, Specification Divisions 00 and 01, and Specification sections applicable to each Contractor’s scope. 2. Contractor is responsible for all labor and equipment to unload, account for all material delivered, stock, and delivery for this scope of work. Storage and delivery of materials and equipment at the Site shall be permitted only to the extent approved in advance by the Construction Manager, and if anything so stored obstructs the progress of any portion of the work, it shall be promptly removed or relocated by the Contractor without reimbursement. 3. On site supervision by Prime Contractor at all times work by that contractor or their subcontractors/suppliers is taking place.rovide all temporary facilities required for this scope of work including trailer, trailer power, telephone, secured storage, temporary power for work, temporary and task lighting for work, etc. as determined necessary by Contractor. Coordinate location of trailers, material storage and utility lines with Construction Manager. Limited space is available, and permission to bring any such facility or excess materials on to the site shall be approved by the Construction Manager. 5. Contractor shall provide all equipment and tools for Contractor’s own cleanup. Clean up shall be done at end of every shift or more frequently if required for the Contractor to perform their work, for other Contractors to perform their work, as required by the Owner’s operations, and at the discretion of the Construction Manager. 6. All turf, landscaping, and subgrade disturbances caused by equipment traffic or other activities related to the Contractor’s scope shall be repaired or restored to proper conditions by the Contractor. 7. Protect adjacent existing building elements from damage from Scope of work. Repair existing building elements damaged during Contractor’s Scope of work. 8. Contractor shall maintain an accurate set of As-Built Drawings throughout the duration of the project and submit to the Construction Manager at the completion of the project. 9. Entrance into the site is required to be through the sallyport or main admin building areas to gain access. Work is not accessible without need to walk through full secure inmate location. Question Deadline 12/17/2025 at 2:00 PM CT Questions must be submitted to the Issuing Office State of Iowa, Department of Administrative Services , Hoover State Office Building, 3 rd floor , 1305 East Walnut Street , Des Moines, IA 50319-0105, Phone: 515-823-9327; email: construction.procurement@i owa.go
Award
Bridges / Tunnels
$300,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 23, 2025
January 13, 2026
406 N High St, Anamosa, IA
Related To This Project
Anamosa, IA
Bid Date: Jan 30 2026
Anamosa, IA
Bid Date: Feb 06 2026
Anamosa, IA
Bid Date: Dec 11 2025
Anamosa, IA
Bid Date: Nov 12 2025
Anamosa, IA
--
Anamosa, IA
--
Anamosa, IA
--
Anamosa, IA
Bid Date: Nov 18 2025
Anamosa, IA
Bid Date: Dec 18 2025
Anamosa, IA
Bid Date: Nov 04 2025
Anamosa, IA
Bid Date: Aug 26 2025
Anamosa, IA
--
Anamosa, IA
Bid Date: Jul 15 2025
Anamosa, IA
Bid Date: Jun 26 2025
Anamosa, IA
Bid Date: Jun 17 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.