Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 22, 2025 at 7:00 PM
Updated December 27, 2025
Renovation of a multi-residential development in Baltimore, Maryland. Completed plans call for the renovation of a multi-residential development.
Prepare, patch, sand and paint all common areas walls, ceilings, columns, doors and frames, and trim throughout all common spaces as described in the scope of work. Prepare, patch, sand and paint all 1 Bedroom Apartments walls, ceilings, doors and frames, and trim throughout all spaces as described in the scope of work. Quantity: 13 Prepare, patch, sand and paint studio Apartments walls, ceilings, doors and frames, and trim throughout all spaces as described in the scope of work. Quantity: 3 a. All work described shall conform to and be constructed under the provisions of the following codes: - Maryland Building Rehabilitation - International Existing Building Code - Baltimore County Building Code - Building, Fire and Related Codes of Baltimore -International Property Maintenance Code - International Fire Code - International Energy Conservation Code - International Mechanical Code - International Plumbing Code - NEC National Electrical Code - International Fuel Gas Code - Uniform Federal Accessibility Standards (UFAS) - 2010 ADA - HUD minimum Property Standards Latest edition, as well as all requirements of the local, state and national codes. b. All materials shall be new and first quality, all workmanship shall be performed by skilled craftsmen. All materials and labor shall meet the highest standards of the industry. c. Each contractor shall replace and/or restore any materials stored or installed on the site which have been damaged or stolen. d. Contractor shall verify all dimensions in the field. e. The contractor and respective subcontractors shall call for and perform all required test and inspections. f. The Contractor must submit shop drawings for all materials and finishes to be used. g. The Contractor shall confirm that all subcontractors reviewed their scope of work and specifications for the coordination of their work. Any discrepancies and/or omissions will be the sole responsibility of the Contractor. The Contractor shall field verify all dimensions and conditions. h. The Contractor must install temporary security barrier. Any damage to the work area while being completed will be the responsibility of the contractor. Any stolen materials, tools, etc. are the responsibility of the contractor. i. The contractor shall be responsible for all areas where work is being conducted. Final cleaning must be done thoroughly. All floors must be properly clean, mopped and vacuumed as required. All surfaces must be cleared of dust. All ducts, registers, vents, etc. must be cleaned of dust created by the work, all affected filters must be replaced before completion. j. Refer to the attached Finish Schedule for color selection. k. Contractor must submit shop data/cut sheets of all products. Scope of Work Description Renovation notes: All construction work shall include but not limited to the following: 1. Inspect the area of work and photograph before commencement. 2. Any damage caused by the work will be the responsibility of the contractor. 3. If a permit is required, the contractor shall be responsible for applying and paying for permits. 4. Access from apartments doors into hallways and through egress doors shall be maintained at all times. Term of Contract: The Contractor proposes to substantially complete all of the work contained above, within Two Hundred and Ten (210) calendar days after issuance of the Notice to Proceed.
Post-Bid
Multi-Residential
$80,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 26, 2025
January 26, 2026
4041-4021 Frederick Ave, Baltimore, MD
Related To This Project
Baltimore, MD
Bid Date: Dec 26 2025
Baltimore, MD
Bid Date: Dec 29 2025
Baltimore, MD
Bid Date: Dec 26 2025
Baltimore, MD
Bid Date: Dec 26 2025
Baltimore, MD
Bid Date: Dec 26 2025
Baltimore, MD
Bid Date: Dec 26 2025
Baltimore, MD
Bid Date: Dec 26 2025
Baltimore, MD
Bid Date: Dec 26 2025
Baltimore, MD
Bid Date: Dec 26 2025
Baltimore, MD
Bid Date: Jan 13 2026
Baltimore, MD
Bid Date: Dec 23 2025
Baltimore, MD
--
Baltimore, MD
Bid Date: Dec 24 2025
Baltimore, MD
Bid Date: Dec 24 2025
Baltimore, MD
Bid Date: Dec 19 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
