BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2026 at 7:00 PM

Updated March 5, 2026

Renovation of a mixed-use development in Baltimore, Maryland. Completed plans call for the renovation of a multi-residential development; and municipal facility.

The Housing Authority of Baltimore City seeks lump sum cost proposals Basement, 1st & 2nd Floors Apartment Units Kitchen & Bathroom Cabinetry Replacement at BARRISTER COURT - Residential Apartments. Term of Contract: The Contractor proposes to substantially complete all of the work contained above, within Two Hundred and Ten (210) calendar days after issuance of the Notice to Proceed. Contractor shall provide all labor, material, equipment, supervision, permits and all things incidental to complete the scope of services as described in Attachment 1 Price Proposal and Detailed Scope of Work Contractor is to use the scope of work below, and the attached specifications to determine the lump sum cost for the indicated scope of work required. If there are conflicts between scope of work and drawings, the more stringent will apply. The contractor is responsible for acquiring their own dumpster and pay associated permit fees as required by the work and be responsible for the removal of all and any garbage that may be disposed of in the contractors dumpster. The contractor will report to the Construction Manager daily. The contractor must have a person in charge on site daily and have regular site meetings with the Construction Manager and/or Project Manager as well as formal bi-weekly meetings as required. The contractor must submit daily reports including number of workers, trade code, work completed for that date, weather, safety issues, and photographs. The contractor must maintain a clean site outside and inside the work area to not disturb tenants and/or the site operation and safety. The hours of operation shall follow the City Ordinance unless otherwise approved in writing by the Construction Manager. The contractor is responsible for charges, application and holding current required licenses to complete work in the City of Baltimore.

Bid Results

Multi-Residential

$123,472.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
3
Bidding Soon
2,017
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 26, 2025

January 26, 2026

Project location map

1300 Washington Blvd, Baltimore, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.