BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2026 at 7:00 PM

Updated January 24, 2026

Site work and paving for a mixed-use development in Palo Alto, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and road / highway.

The work consists of providing temporary traffic control system and installing temporary traffic detection system; supplying labor, materials, and equipment as required for removal of channelizing island, reconstruction of raised median and raised median extension; removal of existing traffic island and installation of new curb return, sidewalk, gutter, and curb ramps; new PCC curbs, roadside signs, traffic detectors, conduit, conductors, pull boxes, traffic signal poles, traffic detection and monitoring cameras, removal and replacement of traffic stripes, pavement markings, and pavement markers; furnishing and installing traffic signs, utility coordination; installation and removal of landscaping and bioretention area, removal of existing and installation of new inlet and piping; relocation of VTA bus stop, relocation of fire hydrant, relocation of case vent pipe; coordination with Caltrans, City of Palo Alto, VTA, and other stakeholders; and performing other work not specifically mentioned above that is required by the project plans or these Special Provisions. The time limit for the completion of Work is 120 working days commencing on the first charged day, which will be approximately 30-45 days following the Notice of Award by the County of Santa Clara. Question Deadline : 01/02/2026 14:00:00 PT Any questions about this bid Click here to submit them. County of Santa Clara may post responses here or may issue an addendum responding to your questions.

Award

Roads / Highways

$3,842,615.00

Public - County

Paving, Site Work

32

10

15

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
8
Bidding Soon
1,552
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2026

March 16, 2026

Project location map

El Camino Real & Page Mill Rd, Palo Alto, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.