Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 12, 2025 at 7:00 PM
Updated December 13, 2025
Demolition, site work and new construction of a civil project in Sedalia, Missouri. Conceptual plans call for the demolition of a one-story above grade water / sewer project; and one-story above grade water / sewer project.
The scope of work includes professional engineering services for improvements at the Central and North Waste Water Treatment Facilities (WWTF) in Sedalia, Missouri. This covers: 1) construction of a new North Screening & Pump Station, Valve Vault, and Electrical Building; 2) installation of a new 16-inch force main from the proposed North Screening & Pump Station to the existing Central WWTF; and 3) various improvements at the Central WWTF, including work on the Aeration Basin, Blower Building, Clarifier Splitter Structure, Secondary Clarifier, Effluent Parshall Flume & Reaeration Structure, RAS/WAS Pump Station, Central Electrical Building, Sludge Pump Station & Alum Feed Building, and the Sludge Dewatering Building. Engineering services required may include planning, design, and/or construction oversight. Facility plans and engineering reports must adhere to 10 CSR 20-8.110 Engineering – Reports, Plans, and Specifications. Funding is through the Missouri Department of Natural Resources’ Financial Assistance Center, and the CMAR (Construction Manager at Risk) delivery method will be used for this project. Qualification submission requirements include specialized experience and technical competence (35 points), capacity and capability (20 points), past record of performance (30 points), and proximity and familiarity with the project location (15 points). Questions must be submitted in writing. An evaluation committee will review the submissions, and the City may conduct interviews with the top firms. Once the most qualified firm is selected, an engineering agreement will be negotiated, which may also cover services such as assistance with financing, easements, user rate analysis, geotechnical analysis, and surveying.
Conceptual
Water / Sewer
$20,000,000.00
Public - City
Demolition, New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 15, 2025
January 29, 2026
To be determined, Sedalia, MO
Related To This Project
Sedalia, MO
Bid Date: Dec 18 2025
Sedalia, MO
Bid Date: Dec 01 2025
Sedalia, MO
Bid Date: Dec 07 2025
Sedalia, MO
Bid Date: Dec 08 2025
Sedalia, MO
Bid Date: Nov 07 2025
Sedalia, MO
Bid Date: Nov 20 2025
Sedalia, MO
Bid Date: Dec 02 2025
Sedalia, MO
--
Sedalia, MO
Bid Date: Oct 30 2025
Sedalia, MO
Bid Date: Nov 06 2025
Sedalia, MO
Bid Date: Oct 30 2025
Sedalia, MO
Bid Date: Oct 06 2025
Sedalia, MO
Bid Date: Oct 21 2025
Sedalia, MO
Bid Date: Dec 10 2025
Sedalia, MO
Bid Date: Oct 16 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
