BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2026 at 7:00 PM

Updated January 23, 2026

Site work, remodeling and addition to an educational facility in Lewiston, Idaho. Completed plans call for the addition of a one-story above grade educational facility; and one-story above grade educational facility.

Kenaston Corporation is requesting bids for new entry canopy additions and vestibule remodels and associated work at both Whitman and McGhee Elementary Schools for the Lewiston School District. Bids are to be sent on provided bid forms according to instructions in the bid documents. Kenaston Corporation reserves the right to reject any or all bids and to waive informalities or irregularities in the bids. Each subcontractor is responsible for obtaining their own bid documents, which will be available at specified locations. Bidding will follow applicable Idaho Statutes, and a State of Idaho Public Works license is required at the time of bid. No bidder may withdraw their bid after the opening unless the bid award is delayed for more than 60 days. Kenaston Corporation is an Equal Opportunity Employer and encourages bids from Women and Minority Business Enterprises. Project consists of new entry canopy additions and vestibule remodels and associated work at both Whitman and McGhee Elementary Schools. Project Location: a. McGhee Elementary School - 636 Warner Avenue, Lewiston, ID 83501 b. Whitman Elementary School - 1840 9th Avenue, Lewiston, ID 83501 The Project consists of the installation of a new entry canopy and vestibule remodel of each school: 1. Selective demolition of entry doors, vestibule floor and roof framing, exterior sidewalk for new foundations. Removal of existing windows and in-fill for new Kalwall panels in office and restrooms. 2. Installation of new aluminum storefront entry with glazed openings and doors. 3. Installation of new aluminum panel clad entry canopy and single -ply membrane roof 4. Installation of new kalwall panels in office and restrooms. Budget for this project is $1,200,000.00. All questions regarding this project are to be directed to any of the following: o Tim Lynch @ My Architects, 208-743-5902 or email tim.lynch@myarchitectaia.com. o Reece Hewett @ Kenaston Corp., (208)746-1351 or email rhewett@kenaston.com and rafe@kenaston.com. job.No- 25-005m, w

Post-Bid

Educational

$1,200,000.00

Public - City

Addition, Remodeling, Site Work

34

18

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
0
Bidding Soon
139
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2026

March 16, 2026

Project location map

Multiple Locations, Lewiston, ID


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.