Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 29, 2026 at 8:00 PM
Updated June 2, 2026
Renovation of a laboratory facility in Kent, Ohio. Completed plans call for the renovation of a 82,710-square-foot, three-story above grade laboratory facility.
This project entails the performance of the following work 1. The project will install a new fire alarm system throughout the building. Upon completion and acceptance of the new system, the existing system will be demolished. 2. All fire alarm must be installed in conduit. All devices must be new unless otherwise noted. The majority of the work will be conducted above the ceilings to install new conduit and wiring. This will require protection of the lab areas, detailed coordination, and removal and reinstallation of ceiling tiles. Upon completion and initial acceptance of the new system, transition of components from the old system can begin, including replacement of devices and tying into the new system (e.g. duct detectors and other NEX (New at Existing)) locations. A second acceptance test for the modified system will then need to occur. Finally, the old system will be removed. 3. The building has various types of labs using sensitive and high dollar equipment. Additional lab tables and fume hoods are prevalent throughout the buildings. Many of the lab tables have glassware, equipment, etc. The buildings also contain offices, restrooms, corridors and mechanical/electrical spaces. 4. Basis of design is Autocall for the new fire alarm system. Alternate manufacturers are in lieu of Autocall and bid as alternates. The work of this Project is shown on the Drawings and described in the various Sections of the Specifications. Liquid Crystals Materials Science Building Fire Alarm Replacement 1425 Lefton Esplanade Base Bid Estimate:$262,500 Alternate E-1 estimate (-$26,000) Alternate E-2 estimate $77,500.00 Alternate E-3 estimate $26,250.00 Alternate E-4 estimate $5,000.00 This is a Controlling Board project. Anticipated NTP is 9/17/2026. All milestones are calculated from this date. The Contractor is responsible for scheduling the Project, coordinating the Subcontractors, and providing other services identified in the Contract Documents. The EDGE Participation Goal for the Project is 5.0 percent.
Sub-Bidding
Laboratories
$262,500.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 9, 2026
September 17, 2026
1425 Lester A Lefton Esplanade, Kent, OH
Related To This Project
Kent, OH
Bid Date: Feb 12 2026
Kent, OH
Bid Date: Feb 20 2026
Kent, OH
Bid Date: Feb 27 2026
Kent, OH
Bid Date: Mar 11 2026
Kent, OH
Bid Date: Mar 11 2026
Kent, OH
Bid Date: Mar 13 2026
Kent, OH
Bid Date: Mar 13 2026
Kent, OH
Bid Date: Apr 13 2026
Kent, OH
Bid Date: Nov 14 2025
Kent, OH
Bid Date: Nov 06 2025
Kent, OH
Bid Date: Oct 22 2025
Kent, OH
Bid Date: Oct 15 2021
Kent, OH
Bid Date: Nov 05 2019
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
