BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2026 at 7:00 PM

Updated January 21, 2026

Site work for a sidewalk / parking lot in Sunnyvale, California. Completed plans call for site work for a sidewalk / parking lot.

A. INVITATION The City of Sunnyvale is seeking proposals from licensed Engineering firms, landscape architects, or urban planners with a licensed engineer on the proposing team to provide professional services for design and preparation of bid documents and construction support for the Downtown Wayfinding and Gateways project. The scope of work generally includes preparation of: preliminary design, design development, bid documents, and bidding/construction support for Public Works competitive bidding. Ancillary work includes: environmental needs assessment and document preparation, construction cost estimating, schedule monitoring, preparation of reports and recommendations, and project management. Question Deadline 12/22/2025 at 3:00 PM PT B. PROJECT DESCRIPTION This project is to create a unified and clear signage program including the installation of coordinated signs and gateway features to help the public navigate to and within the downtown area. The purpose is to highlight and demark the major entry points into downtown Sunnyvale to identify this area as an important and distinctive part of the community. As the downtown area is revitalized and evolves with new development and more uses, this signage program will improve the aesthetics and promote economic vitality. This will be accomplished with three related elements: 1. Design and installation of wayfinding signage that will direct the public to parking and major features within the downtown area; 2. design and installation of directional signs along major roadways such as Sunnyvale-Saratoga Road, Mathilda Avenue and El Camino Real to guide the public to the downtown; and, 3. Gateway markers at key entry areas announcing the arrival into the downtown area. Three primary markers are needed at the boundaries to the downtown at Mathilda/Washington, Mathilda/El Camino Real, and Sunnyvale/El Camino Real. A fourth gateway feature, located at the Mathilda/Sunnyvale-Saratoga Road split, would direct traffic toward downtown. Gateways may be large pylons, arches, signs, or other similar features to catch the eyes of motorists and indicate arrival to the downtown area. The scope of work for this project will likely include the general tasks listed below. However, the City encourages consultant firms to propose alternative approaches that introduce innovative, higher quality, or impactful results, and cost savings. The consultant is encouraged to propose additional tasks or activities if they will improve the results of the project.

Bid Results

Sidewalks / Parking Lot

$1,719,000.00

Public - City

Site Work

16

5

2

6

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
458
Active Projects
215
Bidding Soon
2,383
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2026

February 28, 2026

Project location map

456 W. Olive Avenue, Sunnyvale, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.