Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 2, 2026 at 7:00 PM
Updated February 5, 2026
Site work and paving for a mixed-use development in Redwood City, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Bids can only be submitted by those A or B licensed contractors who have been pre-qualified with the District, as reflected on the District's website The Work generally consists of site work including a new ADA path and new foundations for two (2) new owner provided/installed modular buildings, associated flat work and landscaping, as well as underground utilities to connect the new buildings to the campus infrastructure systems. Online Q&A Yes The successful Bidder must comply with all prevailing wage laws applicable to the Project, and related requirements contained in the Contract Documents. Question Deadline 01/06/2026 at 5:00 PM PT Melissa Moreno, J.D., the Chancellor of the San Mateo County Community College District, intends to recommend to the Board of Trustees of the San Mateo County Community College District on January 28, 2026 the award of the above-referenced project The estimated NTP date is March 6th, 2026. A. Work comprises of site preparation which includes demolition and off-haul of existing dirt/trees and asphalt (some concrete), installation of a new foundation for two new modulars (Modulars are OFOI) landscaping, playgrounds, fencing, underground utilities, flatwork, and a new ADA path connecting the project site to the rest of the campus located at 4200 Farm Hill Blvd., Redwood City, California 94061. Upgrades are proposed to provide a new facility for the child development department for both educational purposes and student/staff childcare. B. Furnish all labor, materials, equipment, services, permits, temporary controls and construction facilities, and all general conditions, seismic requirements, general requirements and incidentals required to complete the Work in its entirety as described in the Contract Documents. The Work includes, but is not necessarily limited to the following: 1. Construction of new foundations with drilled piers for two buildings. 2. Construction of associated sitework to join the new buildings with the existing campus, including a new ADA pathway, drive aisle and playgrounds. 3. Electrical upgrades, including: connection to the campus MPOE via new utility trenching, two new IDFs, site lighting, etc. 4. Coordination with other contractors working at the site and its Subcontractors, coordination with local utility owners and PG&E and the District, obtaining necessary permits and complying with permit and environmental conditions, project startup and testing, site restoration and cleanup. C. The Work of this Contract comprises construction of all the Work indicated, described in the Specifications, or otherwise required by the Contract Documents. D. Unless provided otherwise in the Contract Documents, all risk of loss to Work covered by Contract Documents shall rest with Contractor until Final Acceptance of the Work. E. Contractor's use of the premises for Work and storage is limited to the area indicated. F. Contractor shall be solely responsible for all utilities (including without limitation electricity, water, gas, etc.) at the Site. G. Contractor shall carefully remove, in a manner to prevent damage, all materials and equipment specified or indicated to be salvaged and reused or to remain the property of District. Contractor shall store and protect salvaged items specified or indicated to be reused in the Work. a. Contractor may furnish and install new items instead of those specified or indicated to be salvaged and reused, in which case such removed items will become Contractor's property. H. Existing materials and equipment removed by Contractor shall not be reused in the Work, except where so specified or indicated. I. Salvaged items not to be reused in the Work, but to remain District's property, shall be delivered by Contractor in good condition to District at the Facilities Maintenance Center, 4200 Farm Hill Blvd. Redwood City, CA 94061. a. Any items specified or indicated to be salvaged which are damaged in removal, storage, or handling through carelessness or improper procedures shall be replaced by Contractor in kind or with new items.y 23, 2026 The Work will be Substantially Complete on or before October 31, 2026, Final Completion- November 15, 2026
Post-Bid
Sidewalks / Parking Lot
$6,000,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 4, 2026
March 6, 2026
4200 Farm Hill Blvd, Redwood City, CA
Related To This Project
Redwood City, CA
Bid Date: Dec 23 2025
Redwood City, CA
--
Redwood City, CA
--
Redwood City, CA
Bid Date: Jan 06 2026
Redwood City, CA
--
Redwood City, CA
Bid Date: Feb 05 2026
Redwood City, CA
Bid Date: Jan 26 2026
Redwood City, CA
Bid Date: Jan 15 2026
Redwood City, CA
Bid Date: Dec 10 2025
Redwood City, CA
Bid Date: Jan 07 2026
Redwood City, CA
--
Redwood City, CA
--
Redwood City, CA
--
Redwood City, CA
Bid Date: Dec 10 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
