Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 14, 2026 at 7:00 PM
Updated January 15, 2026
This is a service / maintenance or supply contract in Redwood City, California. Contact the soliciting agency for additional information.
The City is seeking to partner with up to two (2) experienced and qualified firms to provide 1- Construction Management and 2- Inspection Services to aid in managing the construction of the 2026 Pavement Program projects. The City plans to bid up to six (6) pavement program projects during the 2026 calendar year. Projects are still being finalized, but will include the following projects to start: o Broadway Street Resurfacing Includes three roadway segments along Broadway with ADA curb ramp and Sidewalk Improvements: - Chestnut St to Maple St-Spring St - Winslow St to Arguello St - Brewster Ave to Hopkins Ave o 2026 Citywide Street Resurfacing Program Various street segments totaling up to 20 centerline miles for roadway treatments such as Cape Seal treatments, Dig Out Repairs, Grind & Overlay, Slurry Seal, Microsurfacing, ADA curb ramp, and Sidewalk and Curb & Gutter improvements. This project will be broken up on several smaller project representing the up to total six (6) pavement projects. Question Deadline 01/16/2026 at 3:00 PM PT Questions regarding the information contained in the RFP document must be submitted in writing, by email to the RFP Coordinator: Jaime O. Rodriguez, jaime.rodriguez@redwoodcity.org 1/23/26 City Response to Questions Issued. 3-16-26 Tentative Award of Contract The contract award will be based on a combination of factors that represent the best overall value for completing the scope of work as determined by the City. The City reserves the right to reject any or all responses received through this solicitation, extend the submission due date for, modify, amend, reissue, or rewrite this document, and to procure any or all services by other means. The method of Contractor Selection has not been Determined at this time. Requests for proposals for design services is underway. As part of the 2026 Capital Improvement Program (CIP) the City is planning up to $12M-$14M in pavement projects. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$14,000,000.00
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 17, 2026
Multiple Locations, Redwood City, CA
Related To This Project
Redwood City, CA
Bid Date: Feb 05 2026
Redwood City, CA
Bid Date: Jan 26 2026
Redwood City, CA
Bid Date: Feb 25 2026
Redwood City, CA
--
Redwood City, CA
Bid Date: Jan 06 2026
Redwood City, CA
--
Redwood City, CA
--
Redwood City, CA
Bid Date: Dec 23 2025
Redwood City, CA
Bid Date: Feb 04 2026
Redwood City, CA
Bid Date: Jan 15 2026
Redwood City, CA
Bid Date: Dec 10 2025
Redwood City, CA
Bid Date: Jan 07 2026
Redwood City, CA
--
Redwood City, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
