Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 16, 2025 at 7:00 PM
Updated December 18, 2025
Renovation of an educational facility in Forest City, North Carolina. Conceptual plans call for the renovation of a one-story above grade educational facility.
Prepare and renovate designated spaces to accommodate the current pre-K program currently housed at the Carver Center. Renovate and configure additional spaces to support the expansion of pre-K services beyond current capacity. Provide concurrent design and construction turnkey activities resulting in a finished, fully usable facility that satisfies all requirements and contract terms. All construction must comply with state and local building codes as well as Federal and NC Pre-K and Early Head Start regulations and requirements. Work includes site inventory and evaluation, site investigations, schematic and preliminary design, preparation of design reports, design development, preparation of construction documents, construction administration, and building construction/renovation. Renovations include enlarging restrooms in classrooms, installing new sinks and plumbing, reworking casework, installing windows in restrooms, patching and painting, installing classroom sinks, changing stations, exterior doors and landings, and combining classrooms by demolishing interior walls and reconfiguring restroom access. There will be interactions with the Chief Operations Officer and as needed with the Board of Education and Superintendent via meetings and presentations. The budget for total turnkey design/build services is not to exceed $800,000.00. Respondents must submit a complete, fully executed response in a sealed format by the stated deadline. If mailed, responses should be forwarded by certified U.S. Postal Service to the stated address. Delayed responses will not be considered.
Conceptual
Educational
$800,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 28, 2026
March 14, 2026
2785 Hudlow Road, Forest City, NC
Related To This Project
Forest City, NC
Bid Date: Feb 12 2026
Forest City, NC
Bid Date: Jan 16 2026
Forest City, NC
Bid Date: Apr 14 2026
Forest City, NC
Bid Date: Apr 24 2026
Forest City, NC
Bid Date: May 08 2026
Forest City, NC
Bid Date: Dec 17 2025
Forest City, NC
Bid Date: Oct 28 2025
Forest City, NC
Bid Date: Sep 30 2025
Forest City, NC
Bid Date: Sep 01 2025
Forest City, NC
Bid Date: Sep 09 2025
Forest City, NC
Bid Date: Jun 11 2025
Forest City, NC
Bid Date: May 05 2025
Forest City, NC
Bid Date: Sep 15 2021
Forest City, NC
Bid Date: Sep 15 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
