Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 29, 2025 at 8:00 PM
Updated May 6, 2025
Renovation of an educational facility in Forest City, North Carolina. Completed plans call for the renovation of a educational facility.
Due to the age and deterioration, Rutherford County Schools (RCS) would like to replace the bleachers in the main gymnasium of Chase High School, located at 1603 Chase High Rd, Forest City, NC 28043. Scope of Work Obtain all needed permits Remove two banks of 11 tier telescoping bleachers Properly dispose of existing bleachers Install new telescoping bleachers compatible with 120-volt power source Bleachers should meet ADA standards in regards to aisles, aisle steps, handrails, and flex-row seating. Bleachers should have a gross seating capacity of approximately 1474 seats. Installer/warranty service provider should have demonstrated corporate financial stability for a minimum of 10 years. References to be provided upon request. RCS reserves the right to consider historic information and facts about the proposer, whether gained from the submitted response, question and answer conference, references, or any other source, during the evaluation process. Contractors may bid on one or more projects. Pricing for each location must be priced separately, and if a discount is applicable for multiple locations, this discount should be detailed in the proposal. Final terms and conditions will be specified upon award. Contractor must provide evidence of appropriate insurance coverage prior to award. Rutherford County Schools reserves the right to accept or reject any proposal submitted. Questions and responses will be posted online of original posting. Questions may be addressed to Mr. Darren Lane at (828) 429-8294 Final award will be made on May 6th, 2025. Any prospective proposer may protest in writing to the Finance Officer within three (3) calendar days of the date of the award. Rutherford County Schools may exercise its right to require a protest bond or irrevocable letter of credit from a protesting party when applicable.
Post-Bid
Educational
$500,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2025
June 4, 2025
1603 Chase High Rd, Forest City, NC
Related To This Project
Forest City, NC
Bid Date: Jun 11 2025
Forest City, NC
Bid Date: Sep 09 2025
Forest City, NC
Bid Date: Sep 01 2025
Forest City, NC
Bid Date: Sep 30 2025
Forest City, NC
Bid Date: Oct 28 2025
Forest City, NC
Bid Date: Sep 15 2021
Forest City, NC
Bid Date: Sep 15 2021
Forest City, NC
Bid Date: Feb 05 2025
Forest City, NC
--
Forest City, NC
Bid Date: Oct 25 2024
Forest City, NC
Bid Date: Sep 06 2024
Forest City, NC
Bid Date: Jun 20 2024
Forest City, NC
--
Forest City, NC
Bid Date: May 15 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
